09/04/2026
This design-build project serves as a seepage barrier wall extending as far as 165ft deep. This is one of the deepest commercial soil mixing jobs ever to be performed. Located an hour South of Houston, the project will contribute to the construction of a reservoir in an effort to combat extreme drought and flooding in the area.
Our scope of work is set to be completed by summer of 2027.