08/02/2026
Install of a new E1 dual sewage ejector system. The old 6 inch SDR 35 Sewer Main was back pitching due to a big tree that had its roots pushing down onto the pipe. We were able to install the new E1 dual ejector system and then on the discharge and we were able to run 1-1/4” PE Pipe approximately 325 feet using the old SDR 35 6 inch sewer line as a sleeve to the public sewer. Thanks to the crew at MOR Construction for their professionalism and helping us install the pump. with Scott Roth & Edwin Lopez