Small Town Builders Any of your renovation/building needs, from footings to the peak, contact us for a free quote

The exterior is almost finished. Shortly, we will be backfilling around the addition with black dirt and planting grass ...
10/16/2025

The exterior is almost finished. Shortly, we will be backfilling around the addition with black dirt and planting grass seed. The customer will have a beautiful lawn in the spring.

Drywall has been completed and it’s ready for primer and paint. The floor is prepped for new beautiful vinyl plank.
10/15/2025

Drywall has been completed and it’s ready for primer and paint. The floor is prepped for new beautiful vinyl plank.

Even though the posts have been few and far between, we have been moving along nicely on this addition!After framing and...
10/14/2025

Even though the posts have been few and far between, we have been moving along nicely on this addition!
After framing and getting the addition watertight came the “rough-in”. This is a very important step in the process that takes some planning and working together among multiple trades. We work with excellent contractors that make this process easy! The rough-in electrical, plumbing, and HVAC were completed. All inspections went perfectly.
All batt insulation has been installed. We will be adding cellulose blow-in on top of the R-39 ceiling batts to give the customer an efficient and warm R-60 ceiling insulation. The walls have R21 inside with an additional R-5 foam board on the exterior that also acts as a thermal break.
Keep an eye out for the next step- Drywall

It has been a busy week, but the job is not done. Everyone has been doing a great job to get this addition’s roof watert...
08/08/2025

It has been a busy week, but the job is not done. Everyone has been doing a great job to get this addition’s roof watertight for the weekend.
Engineered trusses have been set. Rafters have been built out of 2x6 lumber to tie the addition roof/ trusses into the original house’s roof.
Fascia boards, roof and wall sheathing have been installed.
Drip edge, ice guard, and synthetic felt have been applied to help prevent leaks until the shingles and chimney flashing are delivered.
Next, we will be having that pesky electrical mast moved so it is out of the valley in the roof where all the water likes to flow.
Stayed tuned for house wrap, exterior foam board, soffit/fascia, interior walls, the start of the windows, and creating the opening from original house into the addition.
Thanks to Austin at Carter Lumber and ABC Supply for all of the excellent supplies as well as exceptional customer service.

The 2x6 exterior walls have been framed and stood. These walls will provide excellent strength as well as nice and cozy ...
08/07/2025

The 2x6 exterior walls have been framed and stood. These walls will provide excellent strength as well as nice and cozy R-21 insulation later in the process.
Up next are the trusses!

The floor is framed starting with sill seal and 2x8 treated boards. Up next was a 28’- 2ply LVL Beam, 2x10x20 floor jois...
08/06/2025

The floor is framed starting with sill seal and 2x8 treated boards. Up next was a 28’- 2ply LVL Beam, 2x10x20 floor joists, and 3/4” T&G DryGuard OSB. Stay tuned as the walls are going on next.
Thank you Austin Fenskie at Carter Lumber for supplying all the lumber, foam board, and plastic.

The beginning of a 20’x28’ addition. Keep an eye out for more updates as this project starts to come together.Thanks Aar...
08/05/2025

The beginning of a 20’x28’ addition. Keep an eye out for more updates as this project starts to come together.
Thanks Aaron Burkhard and Gus Sanford for the excellent masonry work.
Thank you Dave’s Contracting/Excavating for the timely excavation.

Our customer had some unsafe and slippery exterior stairs that were made from old railroad ties. We custom designed thes...
06/27/2025

Our customer had some unsafe and slippery exterior stairs that were made from old railroad ties. We custom designed these 2 new stairsways with planter boxes to fit our customer’s needs. Do you have some work you need done but you don’t know where to start? Give us a call at 989-928-3484

Contact us at 989-928-3484 for all your framing needs. Whether it’s a small project in your house or a building an addit...
06/20/2025

Contact us at 989-928-3484 for all your framing needs. Whether it’s a small project in your house or a building an addition, we do it all!

Are you in need of some tile work? Maybe a shower, backsplash, or even an accent wall? We can help! Give us a call at 98...
06/20/2025

Are you in need of some tile work? Maybe a shower, backsplash, or even an accent wall? We can help! Give us a call at 989-928-3484.

Are your doors and windows getting old or leaking? We can help! Give us a call at 989-928-3484.
06/19/2025

Are your doors and windows getting old or leaking? We can help! Give us a call at 989-928-3484.

Does your stairway need some updating? We can help! Give us a call at 989-928-3484.
06/19/2025

Does your stairway need some updating? We can help! Give us a call at 989-928-3484.

Address

Auburn, MI

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+19899803432

Website

Alerts

Be the first to know and let us send you an email when Small Town Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Small Town Builders:

Share