Oak Hill Parkway crews recently constructed new curb islands and sections of shared-use path along William Cannon Drive....
06/10/2026

Oak Hill Parkway crews recently constructed new curb islands and sections of shared-use path along William Cannon Drive.

These design components will help improve pedestrian mobility and safety throughout the project corridor.

New portions of US 290 continue to open to traffic as Oak Hill Parkway crews make progress on building the continuously ...
06/03/2026

New portions of US 290 continue to open to traffic as Oak Hill Parkway crews make progress on building the continuously reinforced concrete pavement (CRCP) mainlanes.

Crews are simultaneously working on installing landscaping, illumination, and signage along the project corridor.

Traffic flows on the twin US 290 mainlane bridges after Oak Hill Parkway crews recently completed and opened the westbou...
05/26/2026

Traffic flows on the twin US 290 mainlane bridges after Oak Hill Parkway crews recently completed and opened the westbound section between Old Fredericksburg Road and RM 1826.

Drivers traveling between Downtown Austin and Circle Drive can now do so uninterrupted by a signal.

During a recent overnight traffic switch, Oak Hill Parkway crews opened the westbound US 290 mainlanes between Old Frede...
05/21/2026

During a recent overnight traffic switch, Oak Hill Parkway crews opened the westbound US 290 mainlanes between Old Fredericksburg Road and RM 1826.

Through traffic now has the option to use these mainlanes to bypass several signals on the way to Dripping Springs, while local traffic continues to use the frontage road.

Safety is one of our top priorities on the Oak Hill Parkway project. In recognition of Construction Safety Week, CRC hos...
05/08/2026

Safety is one of our top priorities on the Oak Hill Parkway project.

In recognition of Construction Safety Week, CRC hosted daily guest speakers and demonstrations for our team, putting a spotlight on the critical importance of health and safety both on and off of the project.

Last month, members of our team joined several folks from the Oak Hill community to participate in the project's fifth a...
05/05/2026

Last month, members of our team joined several folks from the Oak Hill community to participate in the project's fifth annual cleanup in support of Keep Austin Beautiful Day!

Together, we picked up and disposed of over 25 pounds of litter, trash, and debris from the shared-use paths along US 290 built as part of the Oak Hill Parkway project.

An Oak Hill Parkway subcontractor installs metal beam guard fence along the future westbound US 290 mainlanes near Old B...
04/28/2026

An Oak Hill Parkway subcontractor installs metal beam guard fence along the future westbound US 290 mainlanes near Old Bee Caves Road.

The fence acts as a roadside safety barrier designed to absorb impact and contain vehicles within the roadway, providing essential protection for drivers.

Oak Hill Parkway crews install curb islands and traffic signal infrastructure at the future Convict Hill Road cross-stre...
04/21/2026

Oak Hill Parkway crews install curb islands and traffic signal infrastructure at the future Convict Hill Road cross-street bridge as they prepare to open it to traffic.

This cross-street bridge, along with two others along the corridor, features Texas U-turns, which are non-signalized and allow drivers to travel between eastbound and westbound US 290 without stopping at a signal.

The twin mainlane bridges over William Cannon Drive are complete and nearly ready to support traffic traveling between A...
04/16/2026

The twin mainlane bridges over William Cannon Drive are complete and nearly ready to support traffic traveling between Austin, Dripping Springs, and Bee Caves.

The mainlanes were raised and stacked above the frontage roads in this area to minimize impacts to nearby Williamson Creek and tree preservation areas.

With the assistance of heavy machinery, an Oak Hill Parkway crew places dirt between a soil nail wall and the new concre...
04/14/2026

With the assistance of heavy machinery, an Oak Hill Parkway crew places dirt between a soil nail wall and the new concrete barrier along the eastbound US 290 frontage road west of Convict Hill Road.

This wall was constructed to support the new US 290 mainlanes, which were lowered approximately 25 feet in this area.

Address

7748 US 290 West
Austin, TX
78736

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+17372266431

Alerts

Be the first to know and let us send you an email when Colorado River Constructors, OHP posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Colorado River Constructors, OHP:

Share