Poseidon Jackup

Poseidon Jackup Elevate Your Project

Poseidon Jackup combines Combifloat’s globally proven modular jackup technology with Poseidon Barge’s American manufactu...
09/03/2026

Poseidon Jackup combines Combifloat’s globally proven modular jackup technology with Poseidon Barge’s American manufacturing strength. The result is a Jones Act-compliant solution built, owned, and operated in the United States for North American marine contractors.

Learn the story behind the partnership at poseidonjackup.com/our-story.

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

The MES-C7 Self-Elevating Platform combines elevated stability, heavy-duty capacity, and a flexible deck configuration t...
08/28/2026

The MES-C7 Self-Elevating Platform combines elevated stability, heavy-duty capacity, and a flexible deck configuration tailored to your mission equipment and operating method. It’s a purpose-built workspace designed to support efficient marine construction operations.

Explore the possibilities at poseidonjackup.com.

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

Exciting things are happening in Quebec! Jerome Lemanowicz and Jody Jordan of Marine Equipment Solutions are connecting ...
08/26/2026

Exciting things are happening in Quebec! Jerome Lemanowicz and Jody Jordan of Marine Equipment Solutions are connecting with customers, strengthening industry relationships, and exploring new opportunities. The team is thrilled to be joined by Dennis Bras of Combifloat while representing Poseidon Jackup. We’re looking forward to what the future holds!

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

08/24/2026

In observance of Labor Day, Marine Equipment Solutions will be closed on Monday, September 7.

Rasmussen Equipment Company | Poseidon Barge | Portadam | Pacific Gulf Wire Rope | Poseidon Jackup | Humco Marine Products

Configure the MES-C7 Self-Elevating Platform around the crane, load path, material staging, and crew access your lift re...
08/20/2026

Configure the MES-C7 Self-Elevating Platform around the crane, load path, material staging, and crew access your lift requires. With 5,600 ft² of unobstructed deck space and a 440-ton variable deck load capacity, the platform gives contractors room to build an efficient layout for heavy marine construction. Discuss your configuration at poseidonjackup.com/contact.

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

𝟭𝟬𝟬 𝗙𝗲𝗲𝘁 𝗼𝗳 𝗪𝗮𝘁𝗲𝗿 𝗗𝗲𝗽𝘁𝗵. 𝗡𝗼 𝗣𝗿𝗼𝗯𝗹𝗲𝗺.The MES-C7 operates in water depths up to 100 ft, with the ability to operate in gre...
08/13/2026

𝟭𝟬𝟬 𝗙𝗲𝗲𝘁 𝗼𝗳 𝗪𝗮𝘁𝗲𝗿 𝗗𝗲𝗽𝘁𝗵. 𝗡𝗼 𝗣𝗿𝗼𝗯𝗹𝗲𝗺.
The MES-C7 operates in water depths up to 100 ft, with the ability to operate in greater depths under moderate conditions. From shallow port work to deeper nearshore operations, one platform covers the range. Four heavy-duty spud legs with hydraulically operated crossheads jack at approximately 8 inches per minute, helping crews elevate efficiently and get to work with confidence.

Reserve yours today: https://poseidonjackup.com/

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

Waves, currents, and vessel movement can reduce productive working time. Poseidon Jackup’s self-elevating platforms rise...
08/06/2026

Waves, currents, and vessel movement can reduce productive working time. Poseidon Jackup’s self-elevating platforms rise above the water on supporting legs, creating a stable workspace for precise marine construction and geotechnical operations.

See what maximized workability could mean for your project at poseidonjackup.com/contact.

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

Offshore, there's no margin for single points of failure. The MES-C7 Self-Elevating Platform features two independent hy...
07/22/2026

Offshore, there's no margin for single points of failure. The MES-C7 Self-Elevating Platform features two independent hydraulic pump sets, central or local jacking controls, a 4-point mooring system, and full manual backup at every spud well. Built-in redundancy helps keep operations moving. That's not over-engineering. That's what working on the water actually requires.

Connect with our team: https://poseidonjackup.com/contact

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

07/17/2026

No cramped work areas. No maneuvering around fixed obstructions. The MES-C7 Self-Elevating Platform delivers 5,600 ft² of free deck space that can be fully tailored to your mission equipment and operating method. Cranes, pile drivers, material staging: lay it out the way your project demands, not the way the platform dictates. That's the kind of workspace that keeps crews efficient and operations moving.

See full platform specs and reserve yours today at poseidonjackup.com

Marine Equipment Solutions Rasmussen Equipment Company Poseidon Barge Portadam Pacific Gulf Wire Rope Humco Marine Products

07/14/2026

Address

725 E. Parr Road
Berne, IN
46711

Alerts

Be the first to know and let us send you an email when Poseidon Jackup posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share