06/05/2026
Marine structures in the have to perform in demanding coastal conditions — from tidal movement and saltwater exposure to daily access and long-term safety.
On , completed a private dock replacement focused on structural integrity, durability, and reliable waterfront access.
The project included the removal and replacement of piles, joists, and the main walkway and a 32 foot catwalk leading to a boat lift.
Built with purpose. Built for the water. Built for long-term performance.