Dow Construction Corporation

Dow Construction Corporation Excavating, Trucking, Concrete work, Utilities installation, Septic systems.

Poured a concrete pedestal for a new water well pump house, rebar included.
09/07/2022

Poured a concrete pedestal for a new water well pump house, rebar included.

01/06/2022

I would post something but Facebook keeps placing all of my projects to my personal page so I quit trying!

Once we got into the tank we found a few other items that needed attention to let this clarifier run for a few more year...
03/13/2021

Once we got into the tank we found a few other items that needed attention to let this clarifier run for a few more years before replacement. Fill pipe support cables and clamp, lower rake arm support rods, a hole that needed patched and replacement of a rotted band clamp.

Next job was to pull a worn out gear drive from a center drive clarifier, and swap it with a new box.
03/13/2021

Next job was to pull a worn out gear drive from a center drive clarifier, and swap it with a new box.

Once the discs where installed on the new shaft we few it back into position, slid the new bearings on and secured every...
03/13/2021

Once the discs where installed on the new shaft we few it back into position, slid the new bearings on and secured everything into position.

Had to remove 42 discs to be placed onto the new shaft.
03/13/2021

Had to remove 42 discs to be placed onto the new shaft.

Similar situation to last job, only this time the bearing failed and damaged the shaft so now the whole thing had to com...
03/13/2021

Similar situation to last job, only this time the bearing failed and damaged the shaft so now the whole thing had to come out for a complete swap.

Changing out a shaft bearing at a nearby wastewater treatment plant.
03/13/2021

Changing out a shaft bearing at a nearby wastewater treatment plant.

Built a new tighter tolerance bar screen for my local towns wastewater treatment plant.
12/06/2020

Built a new tighter tolerance bar screen for my local towns wastewater treatment plant.

Installed a new 6” raw waterline for a southern Ohio village connecting a new well to their existing water supply line.
12/06/2020

Installed a new 6” raw waterline for a southern Ohio village connecting a new well to their existing water supply line.

Replaced a leaking 8” valve with a new configuration and repaired a damaged 8” PVC water supply line that had broken at ...
12/06/2020

Replaced a leaking 8” valve with a new configuration and repaired a damaged 8” PVC water supply line that had broken at a local area water treatment plant.

Installed a pair of new sewage pumps with stainless steel guide rails so they may be more easily serviced in the future.
12/06/2020

Installed a pair of new sewage pumps with stainless steel guide rails so they may be more easily serviced in the future.

Address

1885 Mount Zwingli Road SE
Bremen, OH
43107

Telephone

+17405697688

Website

Alerts

Be the first to know and let us send you an email when Dow Construction Corporation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share