J. Milne Construction We are a Bristol, Rhode Island based GC, completing anything from remodels to rot repair.

The barn addition at the animal sanctuary from curing of the concrete slab to completion. Collins the cow approved!
08/15/2025

The barn addition at the animal sanctuary from curing of the concrete slab to completion. Collins the cow approved!

The concrete slab & footings we poured last week in Tiverton is fully cured. Now, it’s time to frame the extensions of t...
07/18/2025

The concrete slab & footings we poured last week in Tiverton is fully cured. Now, it’s time to frame the extensions of the stalls on this barn.

Happy 4th of July from J Milne Construction! 417 Hope Street sits right on the parade route of the oldest 4th of July pa...
07/04/2025

Happy 4th of July from J Milne Construction! 417 Hope Street sits right on the parade route of the oldest 4th of July parade in the nation. We hope everyone enjoys the historically accurate & fine work we have completed on the outside of the building so far. We wish everyone a happy & safe celebration.

417 Hope Street now has dormers! With the approval of the historical society, we wanted to add dormers to the third floo...
06/14/2025

417 Hope Street now has dormers! With the approval of the historical society, we wanted to add dormers to the third floor so we could take full advantage of the view of the bay in downtown Bristol.

Framing on the 3rd floor is finished! Finishing touches will be completing the dormer windows facing the water once the ...
05/23/2025

Framing on the 3rd floor is finished! Finishing touches will be completing the dormer windows facing the water once the weather gets nice enough.

Most of the repointing is done on the back building! Here’s a sneak peak on how the soffit on the front building is comi...
05/16/2025

Most of the repointing is done on the back building! Here’s a sneak peak on how the soffit on the front building is coming along.

417 Hope street is moving right along! The mason have started repointing the back building. All structural framing is ju...
05/09/2025

417 Hope street is moving right along! The mason have started repointing the back building. All structural framing is just about complete, letting us get started on framing in the front building from the 3rd floor on down.

Out with the old & in with the new! Removed the old soffit on the front & back of the main building. Then began prepping...
04/18/2025

Out with the old & in with the new! Removed the old soffit on the front & back of the main building. Then began prepping to install a new soffit by adding PT nailers on the existing collar ties. The new soffit that will be installed will be historically accurate, of course!

Here’s the new foundation wall that was poured & the block for the new side on the back building. Now it’s time to clean...
04/11/2025

Here’s the new foundation wall that was poured & the block for the new side on the back building. Now it’s time to clean some original bricks for the outside layer!

After removing the existing field stone, Preferred Concrete helped us form & pour a new foundation to foot the new wall ...
04/04/2025

After removing the existing field stone, Preferred Concrete helped us form & pour a new foundation to foot the new wall about to be finished with block & original bricks!

Address

Bristol, RI
02809

Alerts

Be the first to know and let us send you an email when J. Milne Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to J. Milne Construction:

Share