Lynch Material Handling

Call Directions Website

Lynch Material Handling Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Lynch Material Handling, Industrial Company, 2810 Industrial Drive, Broomfield, CO.
(1)

From sturdy storage in multiple configurations to the most evolved warehouse equipment, including clean rooms, physical security, ergonomic workplace solutions, and more, the pros at LMH plan with you side-by-side to ensure you get just what you and your For nearly 50 years, Lynch Material Handling has provided the highest quality workplace solutions to help you serve customers effectively, protect your product, and create a safe, pleasant work environment.

This is National Truck Driver Appreciation Week, and the most useful way we know to mark it is to look at what happens t...
09/15/2026

This is National Truck Driver Appreciation Week, and the most useful way we know to mark it is to look at what happens to a driver when they reach your building. A dock position that cannot be worked because the leveler is slow or the seal is shot turns into a driver sitting in a cab. That shows up as detention charges, as carriers quietly deprioritizing your lanes, and as inbound schedules that stop meaning anything. Every inbound and outbound shipment your operation runs passes through that one choke point, which makes dock equipment some of the highest-leverage and least examined hardware in the building. We evaluate dock performance as part of the flow it feeds, not as a line item. To the drivers keeping all of it moving this week: thank you. And to the teams receiving them, book a site walk and let's look at your dock.

Twenty-five years today. We are thinking of the people who were lost, the families who carry it, and the firefighters, o...
09/11/2026

Twenty-five years today. We are thinking of the people who were lost, the families who carry it, and the firefighters, officers, and first responders who went toward it. We remember.

The constraint in critical space stopped being square footage a while ago. The average wait for a grid connection in pri...
09/10/2026

The constraint in critical space stopped being square footage a while ago. The average wait for a grid connection in primary data center markets now exceeds four years, and construction is running around 11.3 million dollars per megawatt before any AI fit-out. When new power is four years out, nothing about that timeline helps the deployment you were asked to stand up this year. So the work moves inside the building you already have and already have power to. That means getting more compute into the same envelope without breaking the thermal design: containment that actually separates hot from cold, cages and secure enclosures that let you share space you could not share before, and modular walls that make a controlled room out of an open one. We build those environments as a project, not a parts list. Let's talk.

September is National Preparedness Month, and in a working facility the useful question is not what your plan says. It i...
09/08/2026

September is National Preparedness Month, and in a working facility the useful question is not what your plan says. It is when your building last matched its own drawings. Most operations have a last known good date, and after it came the rack row added over a weekend, the extra level added to gain positions, the pallet weights that crept up as the product mix changed, the room framed in without anyone checking what sat above it. Every one of those was reasonable on the day it happened, and none of them got logged. That gap between the building on paper and the building you are actually running is where a bad day finds you, and it stays invisible until something loads it. We reconcile the two, current conditions against current drawings and current loads, and show you where they have drifted. Let's get it handled.

Every system we design gets handed to somebody who has to run it at 6 a.m. on a Monday. The rack only holds what a team ...
09/07/2026

Every system we design gets handed to somebody who has to run it at 6 a.m. on a Monday. The rack only holds what a team loads correctly. The layout only flows because operators learned it and made it work. The install only lands because a crew showed up and did the work in someone else's building without slowing their operation down. Today is for all of them, on our side and on yours. Enjoy the long weekend. We will be back at it Tuesday.

The call we get most often names a product. More rack, another lift, a bigger cabinet run. Sometimes that is the answer....
09/04/2026

The call we get most often names a product. More rack, another lift, a bigger cabinet run. Sometimes that is the answer. More often the constraint is where things sit relative to each other, and buying equipment before you have looked at that just makes the wrong layout more expensive. We start with measurement instead: how product actually moves from receiving to shipping, where the travel and the waiting pile up, and what the ROI looks like on each option before anyone signs anything. Our space planning engineers put that on a drawing so you are deciding from a plan rather than a hunch. If your current setup feels like it is working harder than it should, we should probably talk.

For three years the answer to a full facility was simple: go lease more building. That option is closing. US industrial ...
09/03/2026

For three years the answer to a full facility was simple: go lease more building. That option is closing. US industrial vacancy fell to 6.5 percent in Q2, the first decline since 2022, and new construction dropped to 47.9 million square feet, the lowest quarterly total since 2016. Landlords have their pricing leverage back, and the best space is going to tenants who can pay for power and automation capability rather than a discount. Which means the cheapest square footage available to your operation in 2027 is the square footage you are already paying to heat, cool, and insure and are not fully using. That is a design problem, and it is one we solve. We should probably talk.

Count the steps between where your team works and where the tools, parts, and fixtures live. Now multiply that walk by e...
08/26/2026

Count the steps between where your team works and where the tools, parts, and fixtures live. Now multiply that walk by every shift, every tech, every day. Centralized storage feels organized, but it quietly taxes every task that needs something from it.

Point-of-use storage puts what the work needs where the work happens. Lista cabinets and drawer systems bring high-density, organized storage right to the line, the cell, or the bench, so parts are a reach away instead of a walk away. Fewer trips, less downtime hunting for the right tool, and a workspace that stays orderly because it was designed to.

We help teams sort out what belongs at the point of use and what belongs centralized, then build the storage to match. Small change, measurable time back.

If your team spends more time walking to tools than using them, let's get it handled. Call (303) 466-2317.

It is the back half of summer. The AC in the break room is losing the fight, the afternoon storms roll through on schedu...
08/24/2026

It is the back half of summer. The AC in the break room is losing the fight, the afternoon storms roll through on schedule, and the floor keeps moving anyway. Trucks still show up. Orders still ship. The work does not check the forecast.

So this one is just a nod to the crews: the forklift operators, the pickers, the dock teams, and the leads keeping it all coordinated through the hottest, stickiest stretch of the year. The systems we build only matter because there are people running them well every single day.

Hydrate, watch out for each other, and keep getting it handled. We see the work.

Most facilities are full on the floor and wide open above it. That empty vertical volume is usable square footage you al...
08/20/2026

Most facilities are full on the floor and wide open above it. That empty vertical volume is usable square footage you already own and already pay to heat, cool, and insure. It is just sitting there.

A mezzanine or work platform turns that dead air into a real second level: a home for slow-moving inventory, a QC or assembly area, a supervisor's office over the line, or straight additional storage. It goes in without the timeline, cost, or permitting weight of expanding the building itself, and it is engineered to your load, your codes, and your workflow.

We design and install these into working facilities without shutting the operation down to do it. Build up, not out, and get back the space that was over your head the whole time.

If you are out of floor but not out of building, we should probably talk. Schedule a free consultation: lmhco.com/schedule-a-consultation/

Address

2810 Industrial Drive
Broomfield, CO
80020

Alerts

Be the first to know and let us send you an email when Lynch Material Handling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share