05/22/2026
On Monday, May 18, Mayor Sean Ryan and Congressman Tim Kennedy, along with representatives from the Buffalo Niagara Medical Campus and the Buffalo Sewer Authority broke ground for the Middle Main Streetscape Project, a $70 million project to redesign and modernize a 2.5 mile stretch of Main Street from Goodell to Kensington Avenue. The project is scheduled to be complete by 2029.
DiDonato is proud to be the designer of the project. Our Team includes:
-Watts Architecture & Engineering - Environmental
-Joy Kuebler LA - Landscape Architecture
-KHEOPS - Survey
-IMEG - Electrical/Lighting
-ALTA - Cycle Track
-Highland Planning - Community Outreach
-Kubit Engineering - Construction Inspection
From Buffalo Rising:
The project is focused on creating a safer, more accessible, and more connected Main Street corridor in Buffalo for residents, businesses, cyclists, pedestrians, transit riders, and motorists alike. In addition to roadway repaving, the project includes major upgrades aimed at improving safety, accessibility, green infrastructure, beautification, and quality of life along one of Buffalo’s most important commercial and transportation corridors.
The Middle Main Streetscape Project includes:
-Full roadway repaving along the 2.5-mile corridor
-New ADA-compliant sidewalks and pedestrian improvements
-Replacement and modernization of traffic signals and intersections
-Protected bicycle infrastructure designed for riders of all ages and abilities on both sides of the corridor
-Enhanced crosswalks and safer pedestrian crossings
-New street trees, landscaping, shrubbery, benches, trash receptacles, and trellises
-Upgraded LED street lighting and pedestrian-scale lighting
-Green infrastructure improvements in partnership with the Buffalo Sewer Authority
-2.5 miles of new bicycle infrastructure
-Improvements designed to better connect neighborhoods to transit, jobs, businesses, and the Buffalo Niagara Medical Campus
Cerrone is the Contractor.