01/14/2026
Steel Nation is kicking off 2026 with a bang, which will be another Record Year, after a tremendous 2025! Excellent safety, logistics, schedules, new employees and a great start to our (2) New Divisions: Steel Nation Microgrids and Steel Nation Mechanical.
The picts attached are current Natural Gas Power projects we are starting-up or finishing: Natural Gas Compression, Gas Processing and Off The Grid, On-Site Nat Gas Power Plants for multiple Data Centers. The DATA CENTER market includes:
* Clean, White, Grey and "Cool" Server Buildings
* RICE (Reciprocating Internal Combustion Engines) + Turbine Buildings
* Medium Voltage PDC (Power Distribution Centers) & Switchgear
* Low Voltage MCC (Motor Control Centers) & Switchgear
* BESS (Battery Energy Storage Systems) & Switchgear
* VFD (Variable Frequency Drive) Buildings
* GIS (Gas-Insulated Switchgear) Substations
* Control/Admin Buildings w/ Offices
* Compression: Stabilizer, Expander, DeEthanizer, Residue, Refridge
* Meter, Regulator, Gas Measurement, Interconnects, Blast Rated
Many of these Pre-Engineered Metal Buildings can deliver in 5-6 weeks, and erected in 2 weeks. All I.S. Net, OSHA, DISA, Safeland, Lift Certified.
To discuss your next Gas Processing, Data Center and Power Plant needs, please contact D. Caskey.