05/21/2026
This week Joe Demark, president and business manager of Local 25, joined the NJ Alliance for Action to talk about building data centers the right way. Here’s our final Myth vs. Truth installment.
🔴 The myth: You'll never have peace again, it's a constant industrial roar next door.
🟢 The truth: Noise is a legitimate concern and an engineering one, not a fixed fact. It is governed by setbacks, equipment enclosures, acoustic barriers and cooling choice, all set in the site plan and built by trades. Doubling the distance from the source cuts noise by about 6 decibels, and jurisdictions now require pre- and post-construction noise studies.
Every one of those mitigation measures is fabricated and installed by skilled tradespeople. Noise is not the price of a data center. It is the result of choices a community can require and trades can deliver.
Hold projects to enforceable limits. Build it right.