FrameWorx Construction

FrameWorx Construction Barndominiums, post frames, shops, decks, lean to, overhang.

06/02/2025

🏗️✨ Your Dream Build Starts Here! ✨🏡
At FrameWorx Construction, we turn your vision into reality — from custom barn-style homes and barndominiums to decks, siding, post-frame buildings, and more.

✅ Quality Craftsmanship
✅ Southern Illinois Proud
✅ Built With Integrity, Every Time

Whether you’re expanding your home, building new, or upgrading the exterior, we’ve got you covered — start with a team that works as hard as you do.

📞 Call us today for a free estimate: 618-387-2389
📧 [email protected]
📍 Serving Southern Illinois & Beyond
📸 Don’t forget to check out our latest projects below!

Ready to Elevate Your Outdoor Living?At FrameWorx Construction, we believe that a great deck can transform your backyard...
04/13/2025

Ready to Elevate Your Outdoor Living?

At FrameWorx Construction, we believe that a great deck can transform your backyard into an oasis of relaxation and fun. We’re excited to announce that we’re looking for our next deck project!

Whether you envision a sleek modern design, a rustic retreat, or a space to host family gatherings, our veteran-led team is ready to bring your dream deck to life.
Let’s collaborate on building a stunning outdoor space that truly enhances your home.

Message us today to schedule a consultation or learn more about our services.
Your perfect deck is just a conversation away!

Looking to add work for the rest of the year. If you know of anybody please refer. We’d be happy to take a look.
09/16/2024

Looking to add work for the rest of the year. If you know of anybody please refer. We’d be happy to take a look.

30x60 shop we just built
08/10/2024

30x60 shop we just built

With the final inspection passed. The house is move in ready. We are so proud of the work, opportunity, and skill displa...
04/01/2024

With the final inspection passed. The house is move in ready. We are so proud of the work, opportunity, and skill displayed by every contractor along the way. What a challenge and great accomplishment this has been. The first in the country to be built. A stamp on the chest for sure. I’m truly humbled and so proud.

Barndominum interior work coming along nicely. Cabinets are being installed, painters are there. Trim is on and floors a...
01/27/2024

Barndominum interior work coming along nicely. Cabinets are being installed, painters are there. Trim is on and floors are installed. Front overhangs go on next week and siding begins.

Some recent jobs we’ve been doing.
11/26/2023

Some recent jobs we’ve been doing.

From spray foam to drywall is such a big difference. We are moving on to painting soon. Septic tanks installed and thing...
10/25/2023

From spray foam to drywall is such a big difference. We are moving on to painting soon. Septic tanks installed and things are looking great.

Finished up the sunroom. Thank you Amber Knight for trusting us! Was a fun job. I’m looking forward to seeing the finish...
09/25/2023

Finished up the sunroom. Thank you Amber Knight for trusting us! Was a fun job. I’m looking forward to seeing the finishing touches with siding and soffits.

The Barndo Roof is complete along with all the fascia and soffits. It’s looking so nice.

We’ll have windows by oct 2 and will start this siding work shorty after.

Slow week. Couple of delays in metal. Sub contractors are doing there thing. Me and Devon started a sunroom job while we...
09/08/2023

Slow week. Couple of delays in metal. Sub contractors are doing there thing. Me and Devon started a sunroom job while we wait for windows.

Finished up framing. Metal shows up next week! Great week. A big thank you to all who have helped and lent a hand along ...
08/25/2023

Finished up framing. Metal shows up next week! Great week. A big thank you to all who have helped and lent a hand along the way.

Sheetings going up. Sub contractors lined up. We are finally starting to close the gap on moving forward. What an incred...
08/11/2023

Sheetings going up. Sub contractors lined up. We are finally starting to close the gap on moving forward. What an incredible challenge and accomplishment this job has been. We’ll be finished with framing next week.

Address

Carmi, IL
62821

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm

Telephone

+16183872389

Website

Alerts

Be the first to know and let us send you an email when FrameWorx Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to FrameWorx Construction:

Share