O’Keefe Excavating

O’Keefe Excavating Excavator operator. Fully insured and registered in multiple counties.

Concrete pour interior slabs level with existing floor for shelving unit installation and exterior pad concrete pour for...
05/15/2026

Concrete pour interior slabs level with existing floor for shelving unit installation and exterior pad concrete pour for utilities and a shed. Novelty/South Russell area.

Garage footers and concrete with a driveway addition, garage framing starting next week.
05/09/2026

Garage footers and concrete with a driveway addition, garage framing starting next week.

Waterproofing repair and Storm line installation in Richmond Heights. No project is too big or too small, reach out for ...
03/04/2026

Waterproofing repair and Storm line installation in Richmond Heights. No project is too big or too small, reach out for a free consultation and quote today!

Concrete prep is complete at Northfield Baptist Church. Sidewalks, driveway, and top landing getting poured with concret...
11/18/2025

Concrete prep is complete at Northfield Baptist Church. Sidewalks, driveway, and top landing getting poured with concrete this week. Then on to start construction of the breezeways and roof overhangs!

Backfill completed with 57 wash gravel and plastic to separate dirt and stone. Rough grade yard, next is final grade and...
09/09/2025

Backfill completed with 57 wash gravel and plastic to separate dirt and stone. Rough grade yard, next is final grade and some regrading in the front yard by the street ditch for the homeowner.

Excavation completed, all storm and drain lines jet pressure washed and cleared, foundation pressure washed and parged/m...
08/29/2025

Excavation completed, all storm and drain lines jet pressure washed and cleared, foundation pressure washed and parged/mortared. Ready for tar, pipe installation, and wash gravel backfill after inspection tomorrow morning.

Concrete removal and repair done on a couple bad spots at Rescue Village
06/11/2025

Concrete removal and repair done on a couple bad spots at Rescue Village

Chagrin Falls garage build underway. Custom Windows are 1 week out! White metal siding, black trim, and black metal roof...
05/13/2025

Chagrin Falls garage build underway. Custom Windows are 1 week out! White metal siding, black trim, and black metal roof. This is going to look great!

Little over 16,000 lbs of block installed along with around 100’ of drainage with a yard drain to help prevent water fro...
05/13/2025

Little over 16,000 lbs of block installed along with around 100’ of drainage with a yard drain to help prevent water from going against this homeowner’s house. Turned out awesome! Cleaning up the yard and seed and straw next week.

Peep the before in the last pic!

30’x60’ Chagrin Garage build underway with a breeze-way attaching to the main house. Full footers, driveway cut in, and ...
04/29/2025

30’x60’ Chagrin Garage build underway with a breeze-way attaching to the main house. Full footers, driveway cut in, and concrete pad poured all in one week. Our Amish builder is starting May 5th with framing.