10/28/2025
Our client faced a shear cut in Sparta, NC that required shoring for a cast-in-place basement wall under a tight schedule. Taproot verified existing conditions, crafted a tailored field-driven design, and executed it with precision. Using the ABI TM 14/17V from , we drove all piles and installed 1,400 square feet of lagging in just three days of production. Ready for your next challenge? Reach out to see how Taproot can help.