Berenguer Properties I am a retired Carpenter/Superintendent looking to start or finish your construction projects.

This one took a lot longer than it should have with minnesota weather not cooperating with us. But wow did this turn out...
05/03/2023

This one took a lot longer than it should have with minnesota weather not cooperating with us. But wow did this turn out awesome! With removing their deck and handrail it really opened up their backyard. Time to enjoy this patio with friends and family. Thank you for the opportunity to do this project for you and I hope you enjoy this!

Stairs are poured and stamped now ready for the patio.
05/01/2023

Stairs are poured and stamped now ready for the patio.

Got this deck removed and ready for concrete prep work then Minnesota weather got involved… ready for some nice weather ...
04/22/2023

Got this deck removed and ready for concrete prep work then Minnesota weather got involved… ready for some nice weather so we can get this patio poured. Watch for the end result this one is going to awesome. Custom designed stamped concrete stairs and stamped concrete patio.

2 down 37 more to go.
03/23/2023

2 down 37 more to go.

Deck season is right around the corner. Now is the time to start getting quotes and get on a schedule for spring and sum...
02/17/2023

Deck season is right around the corner. Now is the time to start getting quotes and get on a schedule for spring and summer. Message me for a quote.

3 season porch is up. Final touches on basement framing will be done Monday. Windows delayed until March 10th. Flat roof...
02/10/2023

3 season porch is up. Final touches on basement framing will be done Monday.

Windows delayed until March 10th.

Flat roofers started today and will be finishing up tomorrow.

HVAC starting tomorrow to get temp going. Then rolling into scope work.

Plumbers ready to start when heat is rolling.

Xcel connected permanent power.

If your looking for any construction projects for the spring and summer now is the time to start planning. Message me to get a quote.

Roof is done! Reinstalled the tarp to keep existing hardwood and Sheetrock dry. Time to start punching my way back down ...
01/24/2023

Roof is done! Reinstalled the tarp to keep existing hardwood and Sheetrock dry. Time to start punching my way back down to the basement.

We cut and tore off about 3’ of roof to install this new beam to carry the weight. Demoed the exterior wall on the left ...
01/19/2023

We cut and tore off about 3’ of roof to install this new beam to carry the weight. Demoed the exterior wall on the left of one of the pictures because that wall will move under the beam. Also demoed out the flat roof, spray foamed the exterior and built up the floor to match existing. Now I got a couple more exterior walls then the roof.

If your looking for any construction services send me a message. Booking out for the spring now. deck projects will be pushed more towards the end of spring when frost is out of the ground.

After some floor truss issues and a big snow storm we have lost some time but getting back at it and it’s all coming tog...
01/17/2023

After some floor truss issues and a big snow storm we have lost some time but getting back at it and it’s all coming together.

Back from vacation. Demo crew did their thing now it’s time to tie these two buildings together and start framing exteri...
12/13/2022

Back from vacation. Demo crew did their thing now it’s time to tie these two buildings together and start framing exteriors on the main floor. After demo we noticed more joist were rotten so ended up replacing more joist than originally expected.

More materials showed up but then got the flu. Short week but got some work done. Monday the warmboard subfloor comes th...
11/27/2022

More materials showed up but then got the flu. Short week but got some work done. Monday the warmboard subfloor comes then I can really start going. This client is my old boss from when I was a superintendent. He has set up an office for me with prints and a computer for digital prints. This will make the project go a lot faster when other subs start showing up. It’s the simple things.

Next week i will be demoing into the existing house to tie in the floor systems.

Been working around areas while I wait for material. End of the day today I got the lvls and zip sheeting. Tomorrow to b...
11/22/2022

Been working around areas while I wait for material. End of the day today I got the lvls and zip sheeting. Tomorrow to build the front side of the garage and set floor joist. Next is waiting for the warm board to arrive.

Address

Chaska, MN
55318

Website

Alerts

Be the first to know and let us send you an email when Berenguer Properties posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Berenguer Properties:

Share