Visinoni Brothers Construction

Visinoni Brothers Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Visinoni Brothers Construction, Construction Company, 260 Lockheed Avenue, Chico, CA.

Some days are more interesting than others, today was one of those days. We installed a 10" steel water main across a br...
01/13/2026

Some days are more interesting than others, today was one of those days. We installed a 10" steel water main across a bridge suspended from the top deck of the bridge.

Everyone in construction knows that traffic control stops make the public frustrated.  As much as we would like to get t...
11/11/2025

Everyone in construction knows that traffic control stops make the public frustrated. As much as we would like to get traffic moving as soon as possible its not always as easy as it sounds. You can tell when people are frustrated and more often than not we hear about it. There are rare occasions when you hear from the public that you are doing a good job. This is one of those rare occasions. We appreciate the kind words Kathryn.

Thank You!

Setting a practice tank for Orland Fire Department.
05/25/2024

Setting a practice tank for Orland Fire Department.

Starting Orland Emergency Water 2A project next week. We got a few of the bolt ups done this week.
03/28/2024

Starting Orland Emergency Water 2A project next week. We got a few of the bolt ups done this week.

One of two projects we are working on in Orland. Can't say enough how good our crew is and how well they are doing on th...
11/24/2023

One of two projects we are working on in Orland. Can't say enough how good our crew is and how well they are doing on this project.

We have had a busy year this year. We have substantially completed:1. Gridley High School newest building with Slater an...
11/03/2023

We have had a busy year this year. We have substantially completed:

1. Gridley High School newest building with Slater and Sons. We installed a new water main, fire water, storm drain, and a gas main on the project.

2. An apartment complex called Senator Conness in Chico for Pacific West Builders. It is roughly 155 units. The project was extremely difficult because we were asked to take the underground portion of the work over from another contractor. What made this project more difficult is that it is on the Lava cap. Trenching had already been done but adaptations were needed often because of differences in installation practices. We installed Sewer, domestic Cal Water, fire water, storm drain, primary and secondary electric conduit, AT&T conduit, and Comcast conduit.

3. An apartment complex in the Town of Paradise called Eagle Pointe. It was for Pacific West Builders. It is roughly a 70 unit complex. It is located next to the High School. Being a terraced site it made accessibility difficult and slowed progress as a result. We installed a 35,000 gallon tank, 4 AX100 Orenco treatment tank septic system, sewer, storm drain, PID domestic water, and fire water.

4. A roughly 56 unit apartment complex in Orland for Pacific West Builders. We came back to this site to finish up the PGE gas, primary and secondary electric conduit, AT&T conduit, and Comcast conduit after installing the sewer, storm drain, domestic water, and fire water earlier this year.

5. A Maverick Gas station in Orland for Hilbers Construction. We installed the sewer, storm drain, including a massive detention basin, domestic water, primary and secondary electric, AT&T conduit, comcast, and PG&E Gas.

Active Projects:

1. This week we started 1 of 2 project we bid and recieved from the City of Orland and the Department of Water Resources. Between the two projects we are installing roughly 40,000 lineal feet of domestic water pipe in various sizes including 6", 8" and 10". 155 water services, and 40 fire hydrants.

10/20/2023

We are looking for a Class A/B teamster driver for two local projects coming up. If you have a commercial CDL and are interested in working with us for on these projects for 4-6 months please send come see us. Thanks.

We are happy to be working with Hilber Inc. on a Maverick Truck stop in Orland. We are currently installing a storm drai...
04/19/2023

We are happy to be working with Hilber Inc. on a Maverick Truck stop in Orland. We are currently installing a storm drain detention leach field. This system is roughly 300' x 100' and will be backfill with 1300 tons of crushed rock.

Address

260 Lockheed Avenue
Chico, CA
95973

Opening Hours

Monday 7:30am - 4:30pm
Tuesday 7:30am - 4:30pm
Wednesday 7:30am - 4:30pm
Thursday 7:30am - 4:30pm
Friday 7:30am - 4:30pm

Website

Alerts

Be the first to know and let us send you an email when Visinoni Brothers Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Visinoni Brothers Construction:

Share