Leist Construction Inc

Directions Contact the business

Leist Construction Inc Leist Construction Inc works in the area of new home construction, additions, garages and decks.

Didn't realize how long its been since I've posted something.  Well, we've been busy building this beautiful house.  Thi...
05/16/2026

Didn't realize how long its been since I've posted something. Well, we've been busy building this beautiful house. This project started in August 2025 and is almost complete. 2800 sq ft house, 2400 sq ft covered porch and an 1800 sq ft garage.

Well, for us, this job is in the books.  Big change from start to finish.  The plan is to go back in the spring for a mu...
01/08/2025

Well, for us, this job is in the books. Big change from start to finish. The plan is to go back in the spring for a mud room addition and then we can drywall that black hole and make it super nice. We started this job on the 16th of December and finished today. Redid framing, new electric, drywall, paint, flooring and trim. We'll be going back to redo the stairs eventually, homeowner wants to move everything downstairs first.

Basement finish is coming along nicely
01/01/2025

Basement finish is coming along nicely

While we are waiting on HVAC to finish at my house, we took on a basement finish.  Here you can see the metal studs and ...
12/19/2024

While we are waiting on HVAC to finish at my house, we took on a basement finish. Here you can see the metal studs and partially new electric. This is a permitted city job, which means we are licensed, bonded and insured to do residential construction in the city.

After photos of the mud mixer projects.
12/09/2024

After photos of the mud mixer projects.

Before it got extremely cold, we poured some concrete using our mud mixer.  This thing is awesome.  I poured these two s...
12/07/2024

Before it got extremely cold, we poured some concrete using our mud mixer. This thing is awesome. I poured these two squares of side walk by myself in an hour. That's 25 bags of concrete. I'll post a finished picture later.

Not pictured is our 10 post footers poured with the mud mixer. 95 bags of concrete in 4.5 hours.

After we gutted the house, we gutted half the roof.  Insurance made us take 15 trusses out because the bottom chord at t...
11/14/2024

After we gutted the house, we gutted half the roof. Insurance made us take 15 trusses out because the bottom chord at the main web connection was burnt out.

These were taken out by using our own equipment. A skid steer with a 26 ft boom easily handled these 40 foot trusses.

It took 6 40yrd dumpsters, $3,500 in dump fees and nearly two months to completely gut the inside of the house.The photo...
11/12/2024

It took 6 40yrd dumpsters, $3,500 in dump fees and nearly two months to completely gut the inside of the house.

The photos shown below already have new windows and doors. You can also see some surface mold left over from the 3in. of water that sat on the floor after the fire.

Our page has been a little quiet and we are about to make up for that.  On April 27th of this year I got the phone call ...
11/11/2024

Our page has been a little quiet and we are about to make up for that. On April 27th of this year I got the phone call that my house was on fire. As you can see in the pictures, that was the aftermath. As we have been rebuilding, we have been bad at taking photos of the progress, but we'll get better and we'll post progress photos here on out.

07/30/2024

I'm looking for help for Leist Construction Inc. No experience necessary, just the willingness to learn and show up. Pay based on experience. Shoot me a message.

Address

Chillicothe, OH
45601

Website

Alerts

Be the first to know and let us send you an email when Leist Construction Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Leist Construction Inc:

Shortcuts

Share