08/28/2026
Ever wonder what happens when a roadway needs more than just a few patches?
Our reclamation crew is rebuilding this roadway from the ground up! Using Cement Modified Recycled Base (CMRB), the reclaimer mixes Portland cement into the existing roadway to create a stronger, more stable subgrade for the new pavement.
Here’s the process:
➡️ Spread Portland cement over the existing roadway
➡️ Mix it approximately 12" deep
➡️ Introduce water to help the cement cure
➡️ Compact with a sheepsfoot roller
➡️ Grade the roadway
➡️ Finish with a smooth drum roller
➡️ Chip seal the base
And what’s next? The paving crew takes it from here!