06/03/2026
We finished up the project for wonderful Mr. Floyd! We added some major drainage, removed and replaced all of the damaged rotted lumber, poured a concrete curb within the wall, removed the old pad under the carpet, put new pad down and reinstalled the carpet, insulation, drywall, trims and paint. On the outside we put down landscaping fabric, stone over the drainage, added stepping stones, and rock glue (which I highly recommend!) , reinstalled the siding and downspouts! His house is sound and strong now with all of the appropriate drainage installed! Check out the before, after and in- between!