When we arrived to help the new owners renovate, the kitchen had already been completed by the previous owners, but the rest of the home still needed work. One of the biggest changes was painting all the plywood walls/ceilings white, which sealed the wood and reduced some of the texture. New LVP flooring was installed throughout the house for a consistent look.
In the bedrooms, built-in bed frames were removed to allow for standard furniture. The bathrooms were updated with new vanities, toilets, and Wet Wall tub/shower combos. Outside, the hot tub was moved from the front deck to a new back deck. New light fixtures and baseboard heaters were also installed throughout the home.