03/26/2026
160' x 4' walkway, 10' x 12' terminal platform including a 4’ walkway parallel and perpendicular to the 12’ x 32’ boathouse with a 10k boat lift. What makes this build stand out? Every single piling had to be drilled through solid Coquina rock before setting. Not an easy task using Thru-flow decking, there's zero room for error; every hole, every piling, every measurement had to be absolutely precise. When you're drilling through rock on every set, precision isn’t an option, it is critical! Proud of the team for delivering accuracy, strength, and a flawless finish on a tough set of conditions. Built right. Built to last.