Rising above Belleview Station, Block F, a new project is taking shape in a big way! This impressive project features a 20-story residential tower built atop a five-level parking structure—plus an additional underground level—bringing both scale and complexity to the Denver Tech Center’s newest site.
CTL|T played a key role from the ground up, delivering the geotechnical investigation that set the foundation for success. Using Menard Pressuremeter testing within the bedrock, our team helped optimize a value-engineered foundation design tailored to the site’s conditions.
And we didn’t stop there. Throughout construction, CTL|T has stayed actively involved—providing observation and materials testing services every step of the way. From earthwork and utility compaction testing to drilled pier installation, steel reinforcement inspections, and concrete testing, our team is helping ensure quality, safety, and performance at every level.
Excited to see this project continue to rise!