09/19/2026
West Des Moines double bathroom remodel. We started with the hallway bathroom then finishing with the Master bathroom. Demoing both bathrooms, replacing drywall. And Installing new subfloor. We upgraded the bathroom exhaust fans. The hallway bathroom is a Sterling caulkless tub system. The master bathroom we removed the 1/2 wall and demolished the lower shower ceiling. The homeowners went with an Onyx shower system floor pan. With the shower walls being the Flexstone shower system. Really opening up the master bathroom to its full potential. Both bathrooms bringing peace of mind to the homeowners. From dark and gloomy to open and full of light.