A&R Custom Builders Looking for a Honest Licensed General Contractor? Call us for your Residential and Commercial needs!

Concrete is poured! 🔨Now we’re giving it some time to properly cure before framing begins. We’ll also be water curing th...
10/17/2026

Concrete is poured! 🔨

Now we’re giving it some time to properly cure before framing begins. We’ll also be water curing the slab during these critical early stages to maintain the moisture needed for proper cement hydration.

Concrete doesn’t simply dry to become strong. It gains strength through a chemical reaction between cement and water. Keeping the slab hydrated helps that process continue, promoting better long term strength and durability while reducing shrinkage cracking.

It’s the little details that matter when you’re building something to last!

Next up, framing! 🏡🔨

10/16/2026

Phase one of paint is complete!

All of the trim has been painted, the new construction walls have been primed, and the existing walls received their first coat of color.

Next up, the flooring guys will come in to sand and refinish all of the hardwood floors. Once the floors have had plenty of time to cure, we’ll bring the painters back in for the final round.

The existing walls will get their final color coat, the new construction walls will get two coats of color, and all of the quarter round and baseboard will be caulked and painted one final time.

Doing things in the right order makes all the difference when it comes to getting that clean finished product!

10/15/2026

We are cleaned up and ready to go! Painters are taking a quick lunch break, and then it’s time to get started on interior paint!

This is always one of those stages where everything really starts coming together and feeling like a finished home. Can’t wait to see this transformation!

10/14/2026

Another little walk-through of our addition/remodel project!

Trim is being finished up by yours truly while the painters are getting everything prepped. I’m getting the last of the trim work wrapped up and everything cleaned up so they can get rolling on giving this entire house a full paint lift!

We’re getting closer and closer to seeing this whole project come together!

Alright, we’re making progress! 🔨The masons have been in and built the foundation walls, stone infill is complete, and e...
10/13/2026

Alright, we’re making progress! 🔨

The masons have been in and built the foundation walls, stone infill is complete, and everything is prepped and ready for concrete!

Next up, we’ll be pouring the slab for both the interior addition and the outdoor patio space. One step closer to seeing this project really start taking shape!

Take a look at that master bathroom!The tile floor is covered up right now to keep it protected, but check out that show...
10/12/2026

Take a look at that master bathroom!

The tile floor is covered up right now to keep it protected, but check out that shower! Over 8 feet wide with a his and hers side, laid out perfectly symmetrical from one side to the other.

We even hid the diverter valves inside the knee walls to keep everything looking as clean and sleek as possible. It’s all in the details, and this one is really coming together!

Here are some before and during photos of the interior!There’s been a lot of progress throughout the house as everything...
10/09/2026

Here are some before and during photos of the interior!

There’s been a lot of progress throughout the house as everything is being trimmed out and starting to come together. We’re going to wait to show you the master bathroom until the tile work is finished, so we can give you the full transformation all at once!

For now, here are some before and after photos of the interior space. It’s exciting to see how much the house has changed already, and there’s still more to come!

New project underway “Barbee Project”! 🏡🔨We’re excited to get started on this one. We’ll be building a new addition off ...
10/08/2026

New project underway “Barbee Project”! 🏡🔨

We’re excited to get started on this one. We’ll be building a new addition off the back of the home while also completely remodeling the existing first floor with an updated layout and an all-new kitchen.

The new addition will include a bedroom/office along with a screened-in porch that opens up to a large outdoor patio featuring a built-in fire pit.

Demo is officially complete, and the footings have been dug and poured! We’re out of the gate and making progress. Stay tuned as we take you through this transformation from start to finish!

Here we go, brick veneer is done!A lot is happening inside, but for this post we’re only going to showcase the master su...
10/07/2026

Here we go, brick veneer is done!

A lot is happening inside, but for this post we’re only going to showcase the master suite. With the new addition, we were able to gain a really nice sized walk in closet, a VERY large master bedroom, and a completely new master bathroom!

There’s been a ton of progress throughout the rest of the house too, but we’ll save that for the next post and keep the updates coming instead of throwing it all at you at once!

Next up, we’ll show you what’s been happening throughout the rest of the house!

10/06/2026

Here’s a little before walk-through of our addition/remodel project! This gives you a look at the existing space and a quick talk-through of what we have planned and what’s to come!

Address

Downtown Monroe, NC
28110

Telephone

+19803283773

Website

Alerts

Be the first to know and let us send you an email when A&R Custom Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to A&R Custom Builders:

Shortcuts

Share