Otter Rapids Construction

Call Directions Contact the business

Otter Rapids Construction All aspects of home building and home improvement

We squeezed this one in as we were waiting on materials for another job. 3 guys,  built and papered ready for shingles i...
09/23/2026

We squeezed this one in as we were waiting on materials for another job. 3 guys, built and papered ready for shingles in1 1/2 days. 26'x24' x 9' tall with 6 pitch trusses. Set the trusses by hand đź’Ş

We recently finished some stairs on Fawn Lake in St. Germain. The home owners want to do the railings themselves. There'...
08/26/2026

We recently finished some stairs on Fawn Lake in St. Germain. The home owners want to do the railings themselves. There's a half set that goes to the backyard and then a set going to the lake. On to the next.

Our latest job, in Lac Du Flambeau, was a 2 story addition. There's a one car stall on the left and a bathroom and stora...
08/20/2026

Our latest job, in Lac Du Flambeau, was a 2 story addition. There's a one car stall on the left and a bathroom and storage on the right side of the ground level. There's stairs with a landing going upstairs to a spacious living room with a cathedral ceiling throughout and a 6'x12' deck. We put a new roof on the entire house along with aluminum fascia and soffit. We need to install the siding yet, otherwise we are all done with this one and on to the next.

We love building garages. In and out in 4 days. This one is 28'x30'x10' tall. We framed it, installed the LP siding, alu...
07/30/2026

We love building garages. In and out in 4 days. This one is 28'x30'x10' tall. We framed it, installed the LP siding, aluminum fascia/soffit and Owens Corning Tru Definition shingles. We built this the week it was over 90 degrees all week and during the Canadian smoke invasion....so that was fun. On to the next.

Our recent completed job, we installed metal corrugated  siding, replaced 3 windows and installed a gutter on this cabin...
07/10/2026

Our recent completed job, we installed metal corrugated siding, replaced 3 windows and installed a gutter on this cabin that had just tarpaper on the walls. On to the next....

We just finished this two story deck today. We tore the original deck down, there are before pics at the bottom. It wasn...
07/01/2026

We just finished this two story deck today. We tore the original deck down, there are before pics at the bottom. It wasn't built the best, seemed a little dangerous, especially the stairs. We built it stronger (2x10 joists instead of 2x8 which were overspanned, 6x6 posts instead of 4x4). We basically used the same layout, the only major change was that we moved the ground level stairs towards the left side more so the snow that falls off the metal roof wouldn't land on the stairs in the winter. We also added snow-stops on the roof to slow the avalanches in the winter months. Of course it was the hottest it's been so far this summer this past week, made for some miserable days. The guys worked hard on this one....on to the next.

A 24'x24' garage we built in a 9 hour day. On to the next.
06/11/2026

A 24'x24' garage we built in a 9 hour day. On to the next.

We recently finished this job which consisted of installing custom bent aluminum fascia, soffit, LP smart siding and wra...
05/29/2026

We recently finished this job which consisted of installing custom bent aluminum fascia, soffit, LP smart siding and wrapping 16 windows with aluminum. We also extended the roof to cover the front porch which included new standing seam metal roofing on the entire low sloped roof. On to the next.

Just finished up a kitchen remodel. We removed the 12"x12" ceiling tiles and replaced it with tongue and groove knotty p...
02/23/2026

Just finished up a kitchen remodel. We removed the 12"x12" ceiling tiles and replaced it with tongue and groove knotty pine. Painted the walls, painted the window jambs and casing white, installed new base and shoe, replaced the flooring with luxury vinyl plank that emulates stone, painted the cabinet fronts and replaced the doors and hardware with a more modern style, replaced the '70's style handrail and balusters, and replaced 2 doors (which have to be painted still). On to the next....

Another one in the books. 30'x40'x14' tall. 8 windows, 1 service door, a 12'x12' and a 16'x 8' overhead doors. We had ra...
01/17/2026

Another one in the books. 30'x40'x14' tall. 8 windows, 1 service door, a 12'x12' and a 16'x 8' overhead doors. We had rain, Arctic temps and a bunch of snow during this job. Next up is a kitchen remodel, indoors will be nice 🙂.

Address

5840 River Road
Eagle River, WI
54521

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm
Saturday 8am - 12pm

Telephone

+17158913649

Website

Alerts

Be the first to know and let us send you an email when Otter Rapids Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Otter Rapids Construction:

Shortcuts

Share