07/30/2026
From high in the sky to safe and sound in the boiler room!
This new 400 HP Cleaver-Brooks CBLE boiler has been set in place at a wire and cable manufacturing facility in Connecticut.
Our team supplied the boiler for this project, and we'll be returning to perform startup and commissioning to help ensure everything is operating safely and as designed.
We appreciate the opportunity to support this project and look forward to working alongside the installation team and seeing this system come online!