07/30/2025
Welcome to the first of several major 2025 remodels! This was a big deal. It was basically a complete home makeover complete with a brand new Kitchen, a new Hall Bath, a new Master Bath, new flooring throughout and the entire interior painted; walls, doors and trim.
Kitchen: We kept the same basic layout. Highlights are: Removed the soffits, upgraded with all new modern cabinetry including 42" to the ceiling upper cabinets, quartz counter tops, expanded the counter space, tiled the backsplash, upgraded the pantry, relocated all lighting and lastly new LVP glue down flooring and paint.
Hall Bath: Replaced the construction grade fiberglass shower surround with a new tub and tiled shower, new vanity, quartz countertop, new toilet, new medicine cabinet, LVP glue down flooring, lighting and paint. Replaced the cumbersome pocket door with a traditional hinged door.
Master Bath: Replaced the 4x4 tiled construction grade walk-in shower with a new modern tiled shower complete with a bench and pebbled floor, new vanity, quartz countertop, new toilet, LVP glue down flooring, lighting and paint. Replaced the cumbersome pocket door with a traditional hinged door.
Cabinets, countertops and building materials supplied by . Flooring supplied by .
Message me if you're thinking about a new remodel. I'm currently booking Spring 2026 projects.