07/14/2025
EWEB College Hill Tanks
Construction of two 7.5 million gallon round partially buried AWWA D110 prestressed concrete storage tanks at EWEB E. 40th Ave Storage Tank site. Requiring staking, site preparation, underdrain infrastructure, tank construction, yard piping, sediment and erosion control, and backfilling.