04/21/2026
Most people don't realize how hard it is to deploy a second-life battery system at a commercial site. You need Fire Department approval, city permitting, utility interconnection, UL 1974, and more. Four separate gates — and most projects never clear them all.
RePurpose Energy just did.
A medical clinic in Novato, California now runs on 200 kWh of second-life battery storage, solar on the roof, and multi-day backup power every time PG&E calls an outage. One of the first fully permitted, utility-approved systems of its kind in the country.
The batteries powering it? They would have been scrapped.
If you run a commercial building, cold-storage facility, manufacturing line, or data center and want to explore what this could mean for your operation, visit repurpose.energy.
We're also currently raising on StartEngine. Link in the comments.
—
*This Reg CF offering is made available through StartEngine Primary, LLC, member FINRA/SIPC. This investment is speculative, illiquid, and involves a high degree of risk, including the possible loss of your entire investment.