Track Solutions, LLC

Track Solutions, LLC Premier railroad contractor offering top quality track inspection, track repair and new construction services at unbeatable pricing.

Very proud of how our latest job turned out. Customer has a 14 degree curve with serious drainage, gage, and rail issues...
03/26/2021

Very proud of how our latest job turned out. Customer has a 14 degree curve with serious drainage, gage, and rail issues. With customer budget at the forefront alongside safety, we removed the low side rail, transposed the high side rail to the low side and installed new relay rail on the high side. Pulled, flipped and reinstalled badly plate cut ties. Cribbed all mud areas down to bottom of ties and below bottoms on the ends to drain the trapped water. Finished it off with almost 200 ton of stone. Before and after pictures tell the story on this one.

What are the three highest priority maintenance items that are critical to having safe railroad track?  #1. DRAINAGE #2....
12/19/2020

What are the three highest priority maintenance items that are critical to having safe railroad track?

#1. DRAINAGE
#2. DRAINAGE
#3. DRAINAGE

Someone told me this 24 years ago when I first started my railroad career and it stuck.......because it’s very true.

Check out the before and after pics of a serious mud elimination and tie replacement project in Northumberland County.

11/27/2020

Hirail Setup

We finally stopped making rental companies rich and purchased a backhoe!
11/26/2020

We finally stopped making rental companies rich and purchased a backhoe!

10/23/2020

Track Solutions is hiring. Application available at www.tracksolutionsllc.com

Railroad Laborer Job Description

Job Summary

Work as a member of a crew to install, maintain and repair railroad track.

Primary Activities and Responsibilities
• Slide and align tie plates and set spikes on ties.
• Maneuver ties into place on track bed.
• Secure rail to plates.
• Carry and cleanup tools and materials from work area.

Minimum Qualifications
• High School diploma/GED
• 18 years of age or older
• Valid Driver's License and reliable transportation

Preferred but not Required Qualifications
• Outside work experience (e.g. construction, heavy equipment operation, farming, landscaping)
• Welding experience
• Commercial Driver's License (CDL)

Basic Competencies
• Verbal comprehension (Understand oral and written communications--both general and technical)
• Communication skills (provide clear instructions/directions)
• Reasoning skills (problem solving and troubleshooting skills)
• Basic Math
Physical Requirements
• Heavy work, lifting up to 70 pounds occasionally and up to 100 pounds on a rare basis
• Stoop/bend/kneel/crouch/balance.

Employment Conditions
• Work safely to prevent on the job accidents and injuries
• Wear protective equipment such as hearing protection, safety-toe boots, or safety glasses
• Work hours may include a nonstandard workweek, overtime, and various shift work

Work outside in all weather conditions.

Job Type: Full-time

Salary: $15.00 to $20.00 /hour

10/09/2020

IRIS skeleton track construction, Humboldt Industrial Park — total of 2,307 feet start to finish in two weeks. Great job boys.

10/06/2020

Skeleton tracks complete at IRIS, USA in Hazleton.

Progress at IRIS
09/20/2020

Progress at IRIS

09/18/2020

Starting a new construction job at IRIS in Humboldt Industrial Park. Massive facility bringing lots of new jobs. Honored to be a part of its creation.

08/07/2020

On to our next new construction project for the R&N. When we completed this one, we will have close to 14,000 feet of new track constructed so far in 2020.

I started this business eactly one year ago and had one guy helping me out part time. Today we have 8 full time employee...
08/06/2020

I started this business eactly one year ago and had one guy helping me out part time. Today we have 8 full time employees and are hiring one or two more. We just finished the largest project we’ve had to date.

5,500 feet of new CWR mainline track constructed for the Reading and Northern in Hamburg. I’m super proud of the team for all the obstacles they overcame on this job. Most of the boys are new to railroad work and continue to learn at an impressive pace. Nobody got hurt and the end result is a pure work of art. Can’t ask for anything more.

Address

62 Timothy Leo Court
Fleetwood, PA
19522

Alerts

Be the first to know and let us send you an email when Track Solutions, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Track Solutions, LLC:

Share