Reenergy Black River

Reenergy Black River ReEnergy Black River is located at Fort Drum, the U.S. Army installation near Watertown, NY, which is home to the Army’s 10th Mountain Division. The facili

The facility, which has 60 megawatts of generation capacity, had primarily burned coal to produce electricity. ReEnergy converted the primary fuel source to sustainably harvested local biomass, investing more than $34 million to renovate the facility and develop a state-of-the-art producer of green energy. ReEnergy Black River is a catalyst for sustainable economic growth in New York’s North Count

ry, providing clean, reliable, low-cost energy; supporting local small businesses; and creating — directly and indirectly — hundreds of stable, consistent, well-paying jobs. ReEnergy Black River produces approximately 422,000 net MWh of electricity each year — enough to supply the power needs of about 55,000 homes. The facility could be a secure and reliable source of renewable energy to satisfy 100 percent of Fort Drum’s electricity demand. Efforts are underway to secure a contract with the U.S. Army to provide power to the installation, which would allow Fort Drum to be on the leading edge of Department of Defense initiatives in the areas of renewable energy and sustainability.

Address

PO Box 849 Euphrates River Valley Rd & Oneida Ave
Fort Drum, NY
13602

Alerts

Be the first to know and let us send you an email when Reenergy Black River posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Reenergy Black River:

Share

Category