06/11/2026
Leave the corner guard and temporary surface protection to the team of professionals.
How It Works:
🔷Step 1: Site walk. We note the tread material, riser condition, railing type, and traffic pattern on the staircase. We identify the landing zones and any decorative elements that need special attention.
🔷Step 2: Scope and estimate. You know exactly what's being covered before we touch anything.
🔷Step 3: Installation. Treads, risers, landings, railings, newel posts — all covered. Tagged and logged by location.
🔷Step 4: Check-ins on long projects. We re-secure anything that's been disturbed and replace any damaged sections.
🔷Step 5: Removal and inspection. Everything comes off. PM signs off. Done.