06/05/2026
🚧 FROM UNSUITABLE SOILS TO A FINISHED PROJECT. 🚧
The transformation in these photos goes far beyond what meets the eye.
The “before” photo captures one of the most challenging phases of this project in Panama City. To create a stable foundation, we had to remove significant amounts of unsuitable soils beneath critical structural areas, perform a major dewatering operation, import and compact structural fill, install geogrid reinforcement, and bring the entire site back to grade.
The “after” photo shows the finished 7 Brew, but the real success of this project was built below the surface. Every load of soil removed, every foot of geogrid installed, and every detail of site preparation played a role in ensuring a long-lasting, high-quality finished product.
At BJD Construction Management, we don’t just build projects—we solve problems. From complex site conditions to completed developments, we’re proud to help clients bring their vision to life throughout Florida.
📍 Panama City, FL