Regal Carpentry Regal Carpentry is an Orange County, CA based contractor specializing in, but not limited to, full

At Regal Carpentry, we strive to make your home remodeling experience as truly enjoyable as possible. Our highly trained, and polite, staff will do anything to get the job completed correctly and efficiently. Our work is viewed as being phenomenal, and most full kitchen and bathroom remodels are completed in an average of 5-10 working days. Give us a call, and let us show you how quickly and painlessly we can tackle your remodeling project!

04/13/2025

I am just testing the waters for now, but would any of my former clients/friends/family benefit from Regal Carpentry coming back to Southern California full time (I relocated to AZ for the past 3 years, but don’t love it here)????

This was an unexpected 6 day job I did in OC (long story)! It was for another contractor, and they had already done the ...
06/18/2024

This was an unexpected 6 day job I did in OC (long story)! It was for another contractor, and they had already done the demo, so it was mostly a clean slate.

I installed cabinets in the kitchen, laundry room, and one in the entry way. I also installed double stacked rough top to get this ready for countertop templates.

Other work I did in these 6 days- to cut open some drywall to run a pot filler line, and do some electrical work, and ran all new electrical in the island, with strip outlets on each side of the seating area.

FINAL PICS!!!This was a 44 day solo project (I only subbed out the stucco patches, and counter fabrication)!If you weren...
05/06/2024

FINAL PICS!!!

This was a 44 day solo project (I only subbed out the stucco patches, and counter fabrication)!

If you weren’t here for the whole adventure, through pics posted, this was a full hall bath, master bath, hallway, and master bedroom remodel. Each room had major framing, electrical, plumbing, drywall, and painting work done to them (all before, during, and after pics are in this album).

I am exhausted, but very happy of the outcome!

Days 38 & 39- the quartz was installed in the shower & vanity, I finished setting the tile in the shower, installed the ...
04/27/2024

Days 38 & 39- the quartz was installed in the shower & vanity, I finished setting the tile in the shower, installed the big medicine cabinet, installed the faucets, and painted the ceilings in the master closet, master bedroom, and hallway.

Days 36&37- my patience was really tested on both of these days due to the tile I had to work with! I tiled the inside o...
04/25/2024

Days 36&37- my patience was really tested on both of these days due to the tile I had to work with!

I tiled the inside of the window, tiled the marble accent shower wall, set the floor tile, changed out all outlets/ switches in the bedroom & bathroom, and Chad made it back to complete the stucco patches.

Days 34&35- primed the bedroom, closet, & bathroom, painted the whole bathroom, installed the white oak prefab cabinets,...
04/23/2024

Days 34&35- primed the bedroom, closet, & bathroom, painted the whole bathroom, installed the white oak prefab cabinets, installed rough top & sinks, installed the huge lighted mirror, & set some more of the shower tiles

Days 32 & 33- sanded & textured the bathroom, bedroom, & closet, started installing the shower wall tile, cut in the gia...
04/21/2024

Days 32 & 33- sanded & textured the bathroom, bedroom, & closet, started installing the shower wall tile, cut in the giant niche, assembled/modified the prefab vanity cabinets, and fit the custom made doors on the hallway cabinet (they still need to be clear coated).

Days 30&31- insulated the master bedroom wall, taped the drywall seams & applied multiple coats of mud on the bathroom, ...
04/19/2024

Days 30&31- insulated the master bedroom wall, taped the drywall seams & applied multiple coats of mud on the bathroom, master bedroom, & master closet, installed/waterproofed the shower walls & pan, set the shower pan tile, & my stucco guy started working on the exterior window patching.

Day 29- removed the drywall on one of the master bedroom walls, framed in openings for the new windows, chipped out the ...
04/17/2024

Day 29- removed the drywall on one of the master bedroom walls, framed in openings for the new windows, chipped out the stucco, properly flashed/ installed the new windows, and poured leveling cement in the entire master bathroom due to the original concrete being poorly installed.

Address

Orange County
Fountain Valley, CA
92708

Opening Hours

Monday 8am - 8pm
Tuesday 8am - 8pm
Wednesday 8am - 8pm
Thursday 8am - 8pm
Friday 8am - 8pm
Saturday 8am - 8pm
Sunday 8am - 8pm

Website

Alerts

Be the first to know and let us send you an email when Regal Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Regal Carpentry:

Share