Ridgeline Building Group llc

Ridgeline Building Group llc residential contractor licensed,insured, and bonded

The Kunze job is officially fired up and moving right along. Concrete is poured and ready to start bringing this one out...
05/15/2026

The Kunze job is officially fired up and moving right along. Concrete is poured and ready to start bringing this one out of the ground. This place is going to be an absolute monster with a huge RV garage in the center, matching living quarters on both sides, big covered porches, and a sharp barndo-style design from every angle

Bourgeois job update — foundation is laid and this one is all framed up. Got everything cleaned up and ready to roll int...
05/08/2026

Bourgeois job update — foundation is laid and this one is all framed up. Got everything cleaned up and ready to roll into the next phase with rough-in plumbing, electrical, and HVAC starting up. This place is coming along nicely and shaping up to be an awesome build.

Mack job update Framing is officially wrapped up and we’ve got plumbing, HVAC, and electrical rough-ins started and movi...
05/06/2026

Mack job update

Framing is officially wrapped up and we’ve got plumbing, HVAC, and electrical rough-ins started and moving right along. This one is coming together fast.

Can’t wait to see those big crow’s foot porches finished out and wrapped in Doug fir — going to be a showstopper. Not to mention that big shop with a man cave in corner.

Stay tuned, this one’s about to really take shape.

Another one getting fired up — the Mack job is officially underway Concrete is poured for both the house and garage, and...
04/04/2026

Another one getting fired up — the Mack job is officially underway

Concrete is poured for both the house and garage, and the stamped porches are looking sharp. Everything is just about ready to go vertical from here!

Stay tuned, this one’s going to be a good one

New project underway — the Bourgeois job!Got the footers dug and poured, and we’re ready for block. This one’s going to ...
04/02/2026

New project underway — the Bourgeois job!

Got the footers dug and poured, and we’re ready for block. This one’s going to be something special… sitting right behind two waterfalls. Gonna be an awesome place when it all comes together. Stay tuned!

Haven’t posted an update on the Kellum job in a while—this one is an absolute monster.We’ve made some serious progress:•...
04/01/2026

Haven’t posted an update on the Kellum job in a while—this one is an absolute monster.

We’ve made some serious progress:
• Brick is complete
• Tongue & groove ceilings finished on the porches and breezeway
• 7 garage doors installed
• Board and batten metal siding about 75% complete
• Drywall is done
• First stage of painting is about to wrap up

It’s really starting to come together now. Still plenty left to do, but we’re pushing forward and getting closer every day. Stay tuned for more progress!

Wrapped up the Woodason job and what an incredible project this one was!Amazing cabinetry throughout the kitchen, pantry...
02/28/2026

Wrapped up the Woodason job and what an incredible project this one was!
Amazing cabinetry throughout the kitchen, pantry, and laundry room. Built-ins in every closet. Beautiful quartz countertops. A dry stack rock wood-burning fireplace that really sets it off. Even poured a block safe room. So much detail in this build it’s hard to list it all.
Beyond thankful for absolutely great customers who made this project a pleasure from start to finish.

Woodason Build Progress Update..Big strides being made on this one by Ridgeline Building Group LLC! The entire exterior ...
12/23/2025

Woodason Build Progress Update..
Big strides being made on this one by Ridgeline Building Group LLC! The entire exterior is complete, including the rock work and a beautiful wood-burning fireplace wrapped in stone. Garage doors are in, first stage of paint is done, and LVP flooring has been installed throughout.
Next up: cabinet installation and tile work..
You can officially see the end in sight on this build, and it’s coming together strong. Stay tuned for the finishes!

Wrapping up framing on the Kellum build and this thing is an absolute MONSTER.We’ve got 11,345 sq. ft. under roof, a lar...
11/19/2025

Wrapping up framing on the Kellum build and this thing is an absolute MONSTER.

We’ve got 11,345 sq. ft. under roof, a large 3-car garage attached to the home, and a 60×50 shop out back — all connected by a massive breezeway.

Inside, there’s 4,570 sq. ft. of total living space, including a spacious bonus room. Windows and doors are already being installed, and all rough-ins are coming soon as this project keeps rolling forward.

Ridgeline Building Group LLC — bringing big visions to life.

If someone looking for a nice new construction this is a good one
10/30/2025

If someone looking for a nice new construction this is a good one

Beautiful new construction on a large cul de sac lot. This spacious 3BR, 2.5 BA home has an open floorplan, large master suite with lots of upgrades. This home features granite countertops, stainless appliances, designer cabinets, LVP flooring, tile shower in master, and a 2 car garage with epoxy fl...

Address

****
Gainesboro, TN
38562

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Ridgeline Building Group llc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ridgeline Building Group llc:

Share