05/14/2026
It is said that painting is all about the prep work at least 80% of the job, but what is that prep work? It’s the quality of the caulking and the fillers that you use. It is the application process the details, and most importantly on exteriors, it is making sure to avoid water intrusion. All vertical cracks should be Caulked.
These hardy siding boards are loose and falling down.
So I use a Brad nailer to secure the boards and my plastic filler spreader two spread the caulking, thin. But thick enough that it will stay and last.
Also making sure the caulking is premium grade lifetime warranty, 60 year caulking is good. It has to be mildew resistant in our climate Alachua, Florida because of all the humidity and mold we get here.