Zimmermann Dream, Design, Build

Zimmermann Dream, Design, Build We pride ourselves on giving you a top quality finished project, with attention to detail, at an exceptional value.

Well was a good week. 3 different projects
06/05/2026

Well was a good week. 3 different projects

3 weeks in on this bathroom remodel. Nice walk in shower with Bench. We are using counter top material in the shower. Bu...
06/01/2026

3 weeks in on this bathroom remodel. Nice walk in shower with Bench. We are using counter top material in the shower. Built in medicine cabinets. All new cabinets. Second closet with an adjustable shoe rack.
We are using every inch of space.

Tops went in at the kitchen project today.
05/15/2026

Tops went in at the kitchen project today.

This bathroom is 7 working days in. We passed inspection and drywall started today. We removed the 32 inch shower module...
05/15/2026

This bathroom is 7 working days in. We passed inspection and drywall started today. We removed the 32 inch shower module and the whirlpool tub. Replaced them with a closet and a spacious walk in shower with a bench. New vanity and recessed medicine cabinets. The finishes the client chose are beautiful. This is going to be a space to relax.

Let the next project begin, demo is done. Now rebuild today.
05/06/2026

Let the next project begin, demo is done. Now rebuild today.

This kitchen is now opened up to the living room with some beautiful lit display cabinets. Going to be great for enterta...
05/02/2026

This kitchen is now opened up to the living room with some beautiful lit display cabinets. Going to be great for entertaining. All ready for countertops and the hickory floors to be finished.

The bar rebuild is complete, clients had a vision for the space after the basement flooded. Turned out beautiful.
04/24/2026

The bar rebuild is complete, clients had a vision for the space after the basement flooded. Turned out beautiful.

This kitchen is getting close. Open up the wall between the living room and the kitchen. Added an island and lunch bar. ...
04/09/2026

This kitchen is getting close. Open up the wall between the living room and the kitchen. Added an island and lunch bar. They’ll be a pantry with a barn door also slightly opened up the entrance to the kitchen from the laundry. Cabinets are Hickory. 

The next kitchen remodel is all demoed and ready to start putting it back together.
03/12/2026

The next kitchen remodel is all demoed and ready to start putting it back together.

This lower level remodel, is ready for final paint and plumbing. We took a powder room and made it a full bath with a 48...
03/06/2026

This lower level remodel, is ready for final paint and plumbing. We took a powder room and made it a full bath with a 48” shower. Pushed back the redesigned bar wall. Opened and finished the stairwell. New ceiling tile. Lvp throughout. Painted all woodwork, just to mention some of the things we did.

Address

W198N11519 Jamestree Road
Germantown, WI
53022

Alerts

Be the first to know and let us send you an email when Zimmermann Dream, Design, Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Zimmermann Dream, Design, Build:

Share