Zimmermann Dream, Design, Build

Zimmermann Dream, Design, Build We pride ourselves on giving you a top quality finished project, with attention to detail, at an exceptional value.

New acrylic, shower, module, and shower control, in the morning usable by the evening.
09/01/2026

New acrylic, shower, module, and shower control, in the morning usable by the evening.

Basement spuce up, extended the rubber floor, black ceiling paint, new drywall, extended a couple walls and a new vinyl ...
09/01/2026

Basement spuce up, extended the rubber floor, black ceiling paint, new drywall, extended a couple walls and a new vinyl window. Like 9 days

In the next week, this kitchen will be wrapped up. Took out all the old cabinets leveled the floor. Put new cabinets in ...
08/25/2026

In the next week, this kitchen will be wrapped up.
Took out all the old cabinets leveled the floor. Put new cabinets in that go all the way up to the ceiling with the uppers. Put in a huge Peninsula it’s gonna be great for holidays and other get-togethers. All new LVP throughout a lot of the first floor. the biggest thing we did here was slapped up a 15 foot header to open up The Four Seasons room to the kitchen. I think we’re at week like six. Next week Anderson gets the countertops in and then Nordic Plumbing can come in and button up.

This little rec room spruce up is ready for drywall and finishes. Switched out the window to vinyl, added some walls/fin...
08/20/2026

This little rec room spruce up is ready for drywall and finishes. Switched out the window to vinyl, added some walls/finished areas and lighting and outlets. Four days in.

Sprucing up this partially finished and weirdly finished Basement by the previous owner. It will be a nice little rec ro...
08/14/2026

Sprucing up this partially finished and weirdly finished Basement by the previous owner. It will be a nice little rec room. when I’m finished.

Right around 4 weeks in what a transformation. Flooring on Monday. Mr. Anderson will do the tops and Nordic plumbing to ...
08/13/2026

Right around 4 weeks in what a transformation. Flooring on Monday. Mr. Anderson will do the tops and Nordic plumbing to do the Finish plumbing.

Less than 3 weeks in. The wall is removed. Drywall is done. 90% of cabinets are set. Next week will be exciting. Finishe...
08/07/2026

Less than 3 weeks in. The wall is removed. Drywall is done. 90% of cabinets are set. Next week will be exciting. Finished Cabinets and lighting. This kitchen is really gonna shine great place to entertain.

This kitchen is complete, turned out great looks beautiful and the functionality is phenomenal.We removed the soffits, t...
07/31/2026

This kitchen is complete, turned out great looks beautiful and the functionality is phenomenal.
We removed the soffits, the tile floor, the old cabinets. We had to move the plumbing from inside the soffits from the second floor into a small chase in the One closet in the kitchen. It was a lot of work, but it really paid off in the end.

2 weeks in and ready for drywall tomorrow!
07/29/2026

2 weeks in and ready for drywall tomorrow!

This is the latest Kitchen just waiting on tops backsplash and then Plumbing should be pretty close to done by the end o...
07/15/2026

This is the latest Kitchen just waiting on tops backsplash and then Plumbing should be pretty close to done by the end of next week. Eight weeks start to finish.
We removed the old soffits. The 4 inch waistline was in there move that redid all the guts of the closets took out all the tile floor put down new LVP.

Address

W198N11519 Jamestree Road
Germantown, WI
53022

Alerts

Be the first to know and let us send you an email when Zimmermann Dream, Design, Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Zimmermann Dream, Design, Build:

Shortcuts

Share