04/04/2024
Morrissey Construction Company has completed extensive renovations at East St. Louis Senior High School located in East St. Louis, IL. The project included relocation of physical education and athletic locker rooms for boys and girls. Along with relocation, upgrades included high-performance flooring, open-face lockers, shower stalls, lighting, bathrooms and air conditioning. The second floor weight room received high-performance flooring, new doors, wall and ceiling repairs and air conditioning. Second floor restrooms were converted to storage spaces. The gymnasium received air conditioning and a renovated coaches office. Fencing and gravel access driveway were extended to allow emergency vehicle access