03/15/2024
Gilberto Padilla
Some of experiences in my work
1) 38 KV new tower ensemble and install CTs and PTs and new transformer 38KV in Best Foot Arecibo PR year 1984. Electrician. Company Arecibo Rapid Electric, Sr Amilcar Acevedo.
2) New Oil processing Tower electrical and control panels install and star up (Mazola, Argo oil to c**k) Best Foot Arecibo PR, with Arecibo Rapid Electric, Sr Amilcar Acevedo year 1985, Foreman.
3) New Engineer Building Project in Merck Sharp & Dohme, Electrical and Controller install with THE WORK COMPANY, year 1985. Pucher and Foreman.
4) Alcohol Tower distillation project in PR- 4, ABBOTT Barceloneta PR, Tech Sr. Leonard Halgreen ABBOTT North Chicago with Petroleum Industrial company in Tank Farm area, year 1985, 1986. I am Forman in Mechanical Industrial and Supervisor in Electrical and Automation System.
5) ADI New Building 39 ABBOTT Barceloneta PR, ALL Electrical installation including Electrical Power Transformer 4.1 KV. Eng. Eduardo Alvarado
6) ADI New Building 40 ABBOTT Barceloneta PR, ALL Electrical Installation including Electrical Power with 750 MCM and 500 MCM. Year 1986, 1987, I start Managing Projects. Eng. Eduardo Alvarado
7) TEST PACK Project, ADI Building 39 ABBOTT with Eng Mary Jane, engineer of ABBOTT North Chicago with TAU Electric company. Year 1986.
8) Install, Calibrations and Star Up the New DCS PROVOX SYSTEM in Fermentation Building in ABBOTT Barceloneta. The Project consisted in Change the Pneumatic Operation System to DCS PROVOX Automatic Control System Controller and Monitoring with (Control Valve, Pumps, Agitators, MCC, Fans, Temperature indicators and transmitters, Levels Transmitter, Pressure indicator and Transmitter, Levels Indicator Transmitters, Temperature Controls, Weight control tanks, PH Control Transmitter, Humidity controls, AHUs, Battery Pad of 480 DC Volts and more) all the process of in 38 Tanks. Eng Ruben Quilez, Eng. Carlos Gil, Abbott PR
9) Install DCS BAILEY in UTILITY Building in ABBOTT Barceloneta PR. That System Control and Monitoring, Chillers, Industrial Compressor, Boilers, Colling Towers, Pumps, Control Valves, Instrument (Control Valve, Pumps, Agitators, MCC, Fans, Temperature indicators and transmitters, Levels Transmitter, Pressure indicator and Transmitter, Levels Indicator Transmitters, Temperature Controls, Weight control tanks, PH Control Transmitter, Humidity controls, AHUs and more) Yeas 1990 Eng. Jose Medina Abbott PR.
10) Install and Star up DCS System FOX BORO in the WWTP new Control Room, ABBOTT Barceloneta Eng. Juan Medina, Year 199x
11) Install and setting Dyers and Autoclaves in Farmacy Building and Extraction area in ABBOTT.
12) Install New Controls a new Control Cabinet in COGEN Control Room to control The Bigger Generator and the Black Start in ABBOTT, Eng Rosotti. Years 199x
13) Install and check New Communication System with Fiber Optic with hubs/fiber optic distribution in different Building in ABBOTT and Pfizer Barceloneta years 199x
14) The first or one of the first in install Fisher Rosemont Delta V system in Tank Farm area, and they were in Pfizer Caguas PR. Year 1999, JCD Engineer, Eng. Juan Carlos Delpino
15) Owens-Illinois Glass Company Vega Alta PR, installation of the new wiring of the glass melting furnace heating transformer. Year 199x Sr. Milton Rosa, Maintenance Manager
16) New Penicillin Building in Bristol, Barceloneta PR. Electrical, Instrumentation and Industrial Mechanic (Pipe Welding, Structural, Pumps and all Equipment install) Company Marland Fabricator. Year 1986, 1987.
17) Removed and Installed 4 fermenters in the Fermentation building at ABBOTT Barceloneta PR. Al of this tank have an more a 35 ft. The Project consist in disconnected all the Electrical Powers, all the Control System an Mechanic machine and pipe for get out the from the building and install the new one. ABBOTT have many pictures of that because that was the most critical project in the history of ABBOTT Barceloneta PR. Marland Fabricator inc. in 1987 or 1988.
18) Install Alfa Lava System to the COGEN Generator and new control instrument for control the Bonker and the oil in the generator. Year 1992. JCD Engineering.
19) New Emergency Power line to the feeding some MCCs in the Utility Area ABBOTT Barceloneta. Line cable 750 MCM and 15KVA Shidler cable with Stress cone. JCD Engineering Year 1993
20) Changed and Calibrate Yokogawa instrument in WWTP Ortho- McNeil Pharmaceutics ( Jonhson & Jonhson ) Las Piedras, PR year 2003.
21) Design, manufacture and installation of partitions that divided the production areas. The design had to include glass so that the production of the production lines that were next door could be observed but had to avoid contamination of the products being worked on. McNeil Pharmaceutic needed it to be manufactured locally because those they sent for did not arrive on time and could not produce with the production lines open because they had already been warned that they were going to be fined! Design of my authorship. GJL CONTRACTOR LLC. Year 2006 Eng. Charlie
22) Electrical Installation in a new Building remodulations for Pharmacy, Auto Parts and Installation in the second floor Police department. Arecibo PR. Year 199x company GJL CONTRACTOR LLC.
23) Remodeling of the old San Luis Theater in Arecibo. The project changed from an old Theater to the Juvenile Court Offices and Health Services premises. Company Arecibo Rapid Electric 1985.
24) Project. PIPE in Wyeth Pharmaceuticals in Carolina PR. Main Contractor TORCON US Company, Instrumentation Contractor Omni Instrumentation Eng. Richard Glenn and Sr Alberto Matos, Subcontractor of Instrumentation work, GJL CONTRACTO INC.
25) Project. Provox Migration in Merck Sharp & Dohme Jamar Electric contract at Gilberto Padilla to Management and Development that Project. Eng. Joseph LaFauci
And many other projects that I will be writing later.
Thank you very much to everyone who at some point worked with me and those who interacted with me as well. I have left many people who were also part of my professional development and because I did not remember their names well, I could not include them but later I will be giving a second part of what I started.