Barnstormer Squadron

Barnstormer Squadron Restoration of a 1943 Boeing Stearman warbird

Flight controls going in
04/03/2020

Flight controls going in

Leading edges going on.
11/27/2019

Leading edges going on.

Installing flight controls.
11/07/2019

Installing flight controls.

Center wing wood working is all finished. Starting the aluminum leading edge on the lower wings.
08/18/2019

Center wing wood working is all finished. Starting the aluminum leading edge on the lower wings.

Center wing is just about complete. Fuel tank is sealed and filled with 47.5 gal of fuel.
06/19/2019

Center wing is just about complete. Fuel tank is sealed and filled with 47.5 gal of fuel.

Leading edge of the center wing skin formed and ready for install
01/15/2019

Leading edge of the center wing skin formed and ready for install

Bottom wing skins going on. Fuselage touch up after weld repair.
02/02/2018

Bottom wing skins going on. Fuselage touch up after weld repair.

Upper wings are varnished. On to the lower wings.
12/12/2017

Upper wings are varnished. On to the lower wings.

Went to Radial Engines LTD today out in Oklahoma. Started the ground work to build up a Jacob's 300hp for the Stearman. ...
10/17/2017

Went to Radial Engines LTD today out in Oklahoma. Started the ground work to build up a Jacob's 300hp for the Stearman. Thanks for the grand tour.

Jake stripping old fabric off the aileron.
09/28/2017

Jake stripping old fabric off the aileron.

Brett working on the center wing this week.
09/28/2017

Brett working on the center wing this week.

Back to work on the wings. Hope to get the top wings done in the next 30days.
08/31/2017

Back to work on the wings. Hope to get the top wings done in the next 30
days.