10/20/2026
3,000 ft of utility trench through hard caliche rock, underneath the Las Vegas Raiders Allegiant Stadium.
Caliche doesn’t cut clean with conventional methods. The AQ-4 kept a consistent trench profile the entire length and increased production for the project to stay on schedule.