11/03/2025
We are in the home stretch. Things look like they're closing up. Doors are up tested operationally, being skinned, parking and Airport Operations area (AOA) paved. Get parking paint stripping going, all the interior offices are under construction. Still a lot to do.
Final inspections should kick off in the next 6-8 weeks. Waiting on permanent power to be brought in from a mile away of wire. (Long story)... NVE is on it.