We are winning the battle but the weather keeps fighting back. After 2 days of solid rain we finally got a full day of w...
06/03/2026

We are winning the battle but the weather keeps fighting back. After 2 days of solid rain we finally got a full day of work in today. We got stuck in the mud three times but were able to use the machines hydraulics to get pulled out. We just have one roof plane left.

Well, we didn't get rained as much as we got hailed out today. Still managed to set a ridge beam and 12 roof panels. We ...
05/30/2026

Well, we didn't get rained as much as we got hailed out today. Still managed to set a ridge beam and 12 roof panels. We feel blessed to get done what we did before the massive storm hit.

Very productive day.  We got the Timberframe roof support system finished up, installed T&G V-grove pine, prepped a few ...
05/29/2026

Very productive day. We got the Timberframe roof support system finished up, installed T&G V-grove pine, prepped a few places for the electrician and even got our first roof panel set. Please pray for the skies to part and the rain go around us!

Timberframe and SIP roof going up.  Yesterday we got the garage roof on and dried in and today we set most of the timber...
05/28/2026

Timberframe and SIP roof going up. Yesterday we got the garage roof on and dried in and today we set most of the timberframe. This home is going to be a show stopper!

Leaving on a jet plane. Monday we will be back again. To install the timberframe and roof SIP's
05/22/2026

Leaving on a jet plane. Monday we will be back again. To install the timberframe and roof SIP's

Another short day but a lot of progress. If the darn rain could have held off just a little longer!  Just three wall pan...
05/20/2026

Another short day but a lot of progress. If the darn rain could have held off just a little longer! Just three wall panels left to set.

We had a short day today due to rain/snow, but we were able to make good progress before then.   I pray this rain moves ...
05/20/2026

We had a short day today due to rain/snow, but we were able to make good progress before then. I pray this rain moves to SD and that we can get a couple nice days yet this week.

Erskin Construction has once again ventured over to Montana to build a home for some wonderful past clients.  Today was ...
05/19/2026

Erskin Construction has once again ventured over to Montana to build a home for some wonderful past clients. Today was day one of this timberfame, SIP home. We unloaded two trucks, got all the bottom plate done, got the garage walls completely up and started on house walls.

The guys got the house dried in and prepared the garage for the concrete floor.  Things are progressing well.
05/15/2026

The guys got the house dried in and prepared the garage for the concrete floor. Things are progressing well.

Closing in on the last roof panel for the house.  The guys worked through the heat to get it almost closed in today.
05/13/2026

Closing in on the last roof panel for the house. The guys worked through the heat to get it almost closed in today.

Address

27407 Woodland Road
Hot Springs, SD
57747

Opening Hours

Monday 7am - 7pm
Tuesday 7am - 7pm
Wednesday 7am - 7pm
Thursday 7am - 7pm
Friday 7am - 7pm
Saturday 7am - 7pm

Telephone

+16058909975

Alerts

Be the first to know and let us send you an email when Erskin Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Erskin Construction:

Share