03/18/2024
Well I posted before about the prelims on this food truck park and all the digging I had to do well, after months of work alone digging over 400 lnft of 24” trench, 4 graves the size of a large sedan and as deep as a actual grave, using a hydro boring system to bore under two commercial driveways over 40’ in length, setting all my 220 RV receptacles, main panel, and meter can then pulling 3000 ft of 6 gauge wire and 1000 ft of 4 O/T i finally made the final inspection on my first commercial electrical and plumbing job and man it was a bitch!
This is what it came looking like when I was done