07/27/2026
📯 Calling all Offshore well intervention & completion experts!
Excited to share this snapshot of our Dual Intervention Stand — the Titan 150 system — now fully assembled and operational for offshore operations. This patented dual-table system is already delivering for completions, interventions, and P&As offshore with multiple major producers, generating significant time and cost savings (millions).
Key advancements over conventional units:
• Offline capability – keep other services running while work continues
• Coil-to-wireline switch in just 30–45 minutes (vs. the typical 12 hours)
• Enhanced safety through measured-pace offline work and minimized crane use
• Versatile pulling capability – can pull tubing and verify cuts, reducing the need for extra rental systems
• Crane independence – less disruption to platform operations
• High wind rating up to 90+ mph – keeps working when cranes must be secured
• Skidding between wells for faster rig-up/rig-down
• Supports coil, wireline, and snubbing on both static and compensator platforms
Swing by our Broussard facility for a hands-on look. Our skilled team is ready to demonstrate its capabilities and answer your technical questions. At PTS Technologies, we deliver secure, bespoke, and dependable solutions tailored to projects of every size. Safety and customization drive everything we do.
Elevate your next venture — visit pts-technology.com or call 281-498-7399.