06/18/2019
The Hilderhoff Well #1 is finally just about complete and ready to be put into production. We have been fighting with this well for over 6 months. In the pictures Texas Swab Company is rigged up and swabbing out drilling fluid, saltwater and general junk out of the well and formation after H&M Acid Services did a large acid job to open up and repair the formation from drilling mud migration.