10/13/2026
The mill was making good product while the gears were quietly wearing.
On a roll-form mill gearbox, AirVibe saw the gear-mesh sidebands growing. MultiViz AI flagged early tooth pitting. Handled in a planned changeover, before the line stopped.
Early, an estimated 5,000 to 20,000 dollars. Late, 50,000 to 250,000 and lost production.
Would a route catch tooth pitting between visits?
I can send the save story.