Watching paint dry is the universal benchmark for boredom.
In custom fabrication, it can also be a literal part of the lead time.
Wet paint requires priming, drying, coating, and more drying. Depending on the application, a wet paint job that takes two weeks might take just one with powder coating. Powder coating also produces a durable finish that is less prone to cracking and other damage.
Wet paint remains the right choice for certain coating and corrosion-resistance requirements. But when powder coating fits the application, it turns out that “watching paint dry” was a lead-time warning all along.