BR Master Construction LLC

BR Master Construction LLC BR Master Construction LLC has been in the construction industry for over 15 years. Company is owned

Company is insured and bonded and all of our crew members are OSHA trained and carry equipment certification.

The Kia Distribution Center project has been completed. Spanning 3.2 million square feet, the overhead protection struct...
03/11/2026

The Kia Distribution Center project has been completed. Spanning 3.2 million square feet, the overhead protection structure also features a solar power generation system, comprising approximately 17,000 solar panels installed on its columns, providing coverage for around 15,000 vehicles.



07/31/2025

Plano Whole Foods project has come to its completion. This is the first unit with polycarbonate roof.
Drive Up Canopy for online ordering from Amazon.

Whole Foods Drive Up Phoenix Arizona
06/24/2025

Whole Foods Drive Up Phoenix Arizona

Our current project has been keeping us busy.
03/13/2025

Our current project has been keeping us busy.

We are thrilled to announce a groundbreaking partnership with Kia! VPS will be installing our advanced hail protection and solar power systems at Kia's U.S…

Circuit of the Americas in Austin Texas T11CarCondos.com Product: Joined Full Custom Canti WingsManufacturer: USA Shade ...
02/07/2025

Circuit of the Americas in Austin Texas
T11CarCondos.com

Product: Joined Full Custom Canti Wings
Manufacturer: USA Shade & Fabric Structures

07/15/2024

Hendricks Automotive Group
Concord NC

Hendricks Automotive GroupConcord NC2 Post Gable with Novashield FabricDiamond Protectors
07/15/2024

Hendricks Automotive Group
Concord NC
2 Post Gable with Novashield Fabric
Diamond Protectors

07/10/2024

Destin/Fort Walton Beach Airport

Destin/Fort Walton Beach AirportCustom Walkway
07/10/2024

Destin/Fort Walton Beach Airport
Custom Walkway

BR Master Construction has teamed up with VPS, KIA, and Transdevelopment Group on adding hail protection at the KIA Asse...
04/19/2024

BR Master Construction has teamed up with VPS, KIA, and Transdevelopment Group on adding hail protection at the KIA Assembly Plant in West Point, Georgia. These structures will also hold solar power trees for their main power source.
We have built a prototype on our property to work out any kinks to ensure the quality of the units. Hands down to the teams working together on building this as to this is definitely no Lego set.

BR Master Construction se ha asociado con
VPS, KIA y Transdevelopment Group sobre cómo agregar protección contra granizo en la planta de ensamblaje de KIA en West Point, Georgia. Estas estructuras también albergarán árboles de energía solar como su fuente principal de energía.
Hemos construido un prototipo en nuestra propiedad para solucionar cualquier problema y asegurar la calidad de las unidades. Sin duda, los equipos han hecho un gran trabajo, ya que definitivamente no es un set de Lego.

City of Roanoke Playground Fairway Ranch Community Sometimes we acquire outside help to assist with our installs. Thank ...
02/05/2024

City of Roanoke Playground
Fairway Ranch Community
Sometimes we acquire outside help to assist with our installs. Thank you to Newstar Drilling and TNT Crane for their quick turnaround on such short notice.
(1) 50x50 Oversized Hip
Covering playground
(1) 14x14 Single Post Pyramid
Covering Picnic table

Address

608 W Palestine Street
Hutchins, TX
75141

Alerts

Be the first to know and let us send you an email when BR Master Construction LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share